HomeMy WebLinkAboutPSA 44th Parallel Park Playgroud Design Install Lee Rec 2024 QuoteDocuSign Envelope ID: OC27ACBF-9BF7-4185-B000-BDF68C55F1DE
11
urirlir« I urr ;Ic rv.tis 1►isc u)rsirr Siurcq1995
DATE: May 6, 2024
To: city of Oshkosh
215 Church Ave.
Oshkosh, WI 54901
FROM: Ryan Lee pjok-�
RE: Request for Proposal -441;h Parallel Park Playground
Option 2 - #LEE-050624-2
Proposal #LEE-050624-2 Includes:
1-Nucleus Modular Playstructure - Designed for ages 5-12
1-synergy Modular Playstructure - Designed for ages 2-5
NEW giant Burke chair - customized
cirrus Multi -User swing
Spinetic Multi -User spinner
NEW Aro spinning chair
Turtle Rocker
2 say -single Post swing Unit with Arm Includes:
2 Belt, 1 Tot, 1- Konnection Swing Seat & 1-Freedom Inclusive
Swing Seat
Age Appropriate Welcome signs
PlayboundTM Poured -in -Place Surfacing with compacted Aggregate
Base
4' concrete Perimeter wally with 3 bump outs for benches
complete Assembly/Installation of equipment & surfacing
Site Restoration
Delivery via our Private Truck Line
Quote is accepted by: Date:
$299,745.00
• TERMS: Net 30
• Lead -Time: 5-10 weeks Upon Receipt of order
• Site Preparation with removal of existing equipment is the responsibility of the customer