HomeMy WebLinkAbout0110569 BOSHKOSH
ON THE WATER
.lob .Address 115 W MELVIN AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY/JO ANN DREXLER
Contractor OWNER
Category 140 - Interior Remodeling
No 110569
Create Date 09/17/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Renewal of permit 103915. SFR/ Remodeling the attic opening up 2 rooms to make 1, convert master bedroom into 2 rooms by adding a
of Work door in living room and a wall in the existing master bedroom.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$7,500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$62.00 Park Dedication $0.00
Date 09/17/2004 Final/O.P. 00/00/0000
Parcel Id # 1006930000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 115 W MELVIN AVE OSHKOSH WI 54901 - 3716 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.