HomeMy WebLinkAbout23-22 CO #1 (FINAL)_8-14-24TO: VINTON CONST COMPANY CHANGE ORDER #1 (FINAL)
1322 33RD STREET
TWO RIVERS, WI 54241
Your present contract with the City of Oshkosh, Contract No. 23-22, awarded May 23, 2023, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($15,508.47)
NET INCREASE TO ADDITIONAL WORK:$29,660.07
NET INCREASE TO CONTRACT $14,151.60
SECTION I TOTALS
BID TOTAL $863,492.50 $863,492.50
CO #1 $14,151.60 $14,151.60
CONTRACT TOTAL $877,644.10 $877,644.10
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: AUGUST 14, 2024
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B
CONTRACT 23-22 CHANGE ORDER #1 (FINAL)
23-22
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $121,850.00
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 160.00 0.00 -160.00 $3.00 ($480.00)
1308
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
as specified
Square
Yards 900.00 864.10 -35.90 $89.00 ($3,195.10)
1360
Adjust manholes and inlets;
complete as specified Each 6.00 4.00 -2.00 $500.00 ($1,000.00)
1370
Turf restoration; complete as
specified
Square
Yards 16.00 0.00 -16.00 $20.00 ($320.00)
1916
4" asphaltic surface LT with
6" CABC and grading;
complete as specified
Square
Yards 21.00 0.00 -21.00 $120.00 ($2,520.00)
3000
Furnish and install 8"
sanitary sewer (relay);
complete as specified
Linear
Feet 30.00 31.00 1.00 $408.00 $408.00
3004
Furnish and install 12"
sanitary sewer (relay);
complete as specified
Linear
Feet 85.00 119.00 34.00 $430.00 $14,620.00
3210
Furnish and install 8" x 6"
sanitary sewer factory wyes
or tees; complete as
specified Each 1.00 1.00 $1,094.00
3214
Furnish and install 12" x 6"
sanitary sewer factory wyes
or tees; complete as
specified Each 13.00 18.00 5.00 $1,322.00 $6,610.00
3234
Furnish and install 4"/6"
sanitary sewer lateral (relay);
complete as specified
Linear
Feet 42.00 84.50 42.50 $280.00 $11,900.00
3235
Furnish and install 4"/6"
sanitary sewer riser (relay);
complete as specified
Linear
Feet 26.00 83.50 57.50 $280.00 $16,100.00
3236
Furnish and install sanitary
sewer lateral marker balls;
complete as specified Each 14.00 18.00 4.00 $120.00 $480.00
3300
Furnish and install
connection to existing 8"
sanitary sewer mains;
complete as specified Each 10.00 8.00 -2.00 $950.00 ($1,900.00)
3304
Furnish and install
connection to existing 12"
sanitary sewer mains;
complete as specified Each 16.00 24.00 8.00 $960.00 $7,680.00
Page 2 of 4
Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B
CONTRACT 23-22 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3330
Furnish and install sanitary
sewer concrete collars;
complete as specified Each 2.00 0.00 -2.00 $1,500.00 ($3,000.00)
3700
Closed circuit televising;
complete as specified
Linear
Feet 4,900.00 4,928.80 28.80 $3.00 $86.40
3701
Lateral launch and setup;
complete as specified Each 95.00 93.00 -2.00 $935.00 ($1,870.00)
3702
Sanitary sewer lateral
televising; complete as
specified
Linear
Feet 3,420.00 2,112.23 -1,307.77 $1.00 ($1,307.77)
3900
Furnish and install 4"/6"
sanitary sewer lateral CIPP;
complete as specified
Linear
Feet 80.00 0.00 -80.00 $10.00 ($800.00)
3901
Furnish and install 8"
sanitary sewer CIPP;
complete as specified
Linear
Feet 3,600.00 3,267.20 -332.80 $40.00 ($13,312.00)
3903
Furnish and install 12"
sanitary sewer CIPP;
complete as specified
Linear
Feet 1,290.00 1,302.00 12.00 $62.25 $747.00
3969
Furnish sanitary sewer
lateral connection air
pressure test; complete as
specified Each 35.00 18.00 -17.00 $995.00 ($16,915.00)
3970
Furnish and install sanitary
sewer lateral connection
grouting; complete as
specified Each 35.00 18.00 -17.00 $10.00 ($170.00)
3980
CIPP sewer lateral
connection liner; complete
as specified Each 45.00 40.00 -5.00 $3,550.00 ($17,750.00)
3981
"Top Hat" sewer lateral
connection liner; complete
as specified Each 2.00 0.00 -2.00 $3,550.00 ($7,100.00)
3990
Sewer lateral connection
removal; complete as
specified Each 10.00 6.00 -4.00 $500.00 ($2,000.00)
3991
Air quality measurement
test; complete as specified Each 2.00 0.00 -2.00 $250.00 ($500.00)
SECTION I (BID ITEMS 1050 - 3991) - SUBTOTAL: $58,631.40 ($74,139.87)
NET DECREASE TO SECTION I: ($15,508.47)
ADDITIONAL WORK REQUIRED: CO #1
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-3902
Furnish and install 10"
sanitary sewer CIPP;
complete as specified
Linear
Feet 0.00 349.60 349.60 $50.13 $17,525.45
Page 3 of 4
Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B
CONTRACT 23-22 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-30002
Sanitary sewer main
collapse repair; complete as
specified
Lump
Sum 0.00 1.00 1.00 $12,134.62 $12,134.62
$29,660.07 $0.00
$29,660.07
($15,508.47)
$29,660.07
NET INCREASE TO CONTRACT: $14,151.60
ADDITIONAL WORK REQUIRED: CO #1 (ITEM) SUBTOTAL:
NET INCREASE:
NET INCREASE TO ADDITIONAL WORK:
NET DECREASE TO SECTION I:
Page 4 of 4