Loading...
HomeMy WebLinkAbout23-22 CO #1 (FINAL)_8-14-24TO: VINTON CONST COMPANY CHANGE ORDER #1 (FINAL) 1322 33RD STREET TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 23-22, awarded May 23, 2023, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($15,508.47) NET INCREASE TO ADDITIONAL WORK:$29,660.07 NET INCREASE TO CONTRACT $14,151.60 SECTION I TOTALS BID TOTAL $863,492.50 $863,492.50 CO #1 $14,151.60 $14,151.60 CONTRACT TOTAL $877,644.10 $877,644.10 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: AUGUST 14, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-22 CHANGE ORDER #1 (FINAL) 23-22 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $121,850.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 160.00 0.00 -160.00 $3.00 ($480.00) 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 900.00 864.10 -35.90 $89.00 ($3,195.10) 1360 Adjust manholes and inlets; complete as specified Each 6.00 4.00 -2.00 $500.00 ($1,000.00) 1370 Turf restoration; complete as specified Square Yards 16.00 0.00 -16.00 $20.00 ($320.00) 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 21.00 0.00 -21.00 $120.00 ($2,520.00) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 30.00 31.00 1.00 $408.00 $408.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 85.00 119.00 34.00 $430.00 $14,620.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 1.00 $1,094.00 3214 Furnish and install 12" x 6" sanitary sewer factory wyes or tees; complete as specified Each 13.00 18.00 5.00 $1,322.00 $6,610.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 42.00 84.50 42.50 $280.00 $11,900.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 26.00 83.50 57.50 $280.00 $16,100.00 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 14.00 18.00 4.00 $120.00 $480.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 10.00 8.00 -2.00 $950.00 ($1,900.00) 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 16.00 24.00 8.00 $960.00 $7,680.00 Page 2 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-22 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 0.00 -2.00 $1,500.00 ($3,000.00) 3700 Closed circuit televising; complete as specified Linear Feet 4,900.00 4,928.80 28.80 $3.00 $86.40 3701 Lateral launch and setup; complete as specified Each 95.00 93.00 -2.00 $935.00 ($1,870.00) 3702 Sanitary sewer lateral televising; complete as specified Linear Feet 3,420.00 2,112.23 -1,307.77 $1.00 ($1,307.77) 3900 Furnish and install 4"/6" sanitary sewer lateral CIPP; complete as specified Linear Feet 80.00 0.00 -80.00 $10.00 ($800.00) 3901 Furnish and install 8" sanitary sewer CIPP; complete as specified Linear Feet 3,600.00 3,267.20 -332.80 $40.00 ($13,312.00) 3903 Furnish and install 12" sanitary sewer CIPP; complete as specified Linear Feet 1,290.00 1,302.00 12.00 $62.25 $747.00 3969 Furnish sanitary sewer lateral connection air pressure test; complete as specified Each 35.00 18.00 -17.00 $995.00 ($16,915.00) 3970 Furnish and install sanitary sewer lateral connection grouting; complete as specified Each 35.00 18.00 -17.00 $10.00 ($170.00) 3980 CIPP sewer lateral connection liner; complete as specified Each 45.00 40.00 -5.00 $3,550.00 ($17,750.00) 3981 "Top Hat" sewer lateral connection liner; complete as specified Each 2.00 0.00 -2.00 $3,550.00 ($7,100.00) 3990 Sewer lateral connection removal; complete as specified Each 10.00 6.00 -4.00 $500.00 ($2,000.00) 3991 Air quality measurement test; complete as specified Each 2.00 0.00 -2.00 $250.00 ($500.00) SECTION I (BID ITEMS 1050 - 3991) - SUBTOTAL: $58,631.40 ($74,139.87) NET DECREASE TO SECTION I: ($15,508.47) ADDITIONAL WORK REQUIRED: CO #1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-3902 Furnish and install 10" sanitary sewer CIPP; complete as specified Linear Feet 0.00 349.60 349.60 $50.13 $17,525.45 Page 3 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-22 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-30002 Sanitary sewer main collapse repair; complete as specified Lump Sum 0.00 1.00 1.00 $12,134.62 $12,134.62 $29,660.07 $0.00 $29,660.07 ($15,508.47) $29,660.07 NET INCREASE TO CONTRACT: $14,151.60 ADDITIONAL WORK REQUIRED: CO #1 (ITEM) SUBTOTAL: NET INCREASE: NET INCREASE TO ADDITIONAL WORK: NET DECREASE TO SECTION I: Page 4 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B