Loading...
HomeMy WebLinkAbout23-05 CO #2 (FINAL)_8-13-24TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #2 (FINAL) P.O. BOX 137 TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 23-05, awarded April 25, 2023, is hereby amended and changed as follows: $327.14 $0.00 $327.14 SECTION I TOTALS $331,569.18 $331,569.18 $15,691.69 $15,691.69 $347,260.87 $347,260.87 327.14 $327.14 $347,588.01 $347,588.01 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney BID TOTAL CO #1 PREVIOUS CONTRACT TOTAL CO #2 CONTRACT TOTAL DATE: AUGUST 13, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET INCREASE TO CONTRACT NET INCREASE TO ADDITIONAL WORK: NET INCREASE TO SECTION I: Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-05 CHANGE ORDER #2 (FINAL) 23-05 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1010 Clearing; complete as specified Stations 6.00 6.00 $350.00 1011 Clearing; complete as specified Inch Diameter 36.00 36.00 $25.00 1020 Grubbing; complete as specified Stations 6.00 6.00 $350.00 1021 Grubbing; complete as specified Inch Diameter 36.00 36.00 $20.00 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $23,500.00 1200 Unclassified excavation; complete as specified Cubic Yards 1,584.27 1,584.27 $27.20 1202 Strip and stockpile topsoil; complete as specified Lump Sum 1.00 1.00 $2,500.00 1210 Borrow excavation; complete as specified Cubic Yards 0.00 0.00 $0.01 1220 Excavation special (paving); complete as specified Tons 329.57 329.57 $0.01 1370 Turf restoration; complete as specified Square Yards 9,153.60 9,153.60 $10.19 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 333.38 333.38 $13.05 1441 30" curb and gutter; plain; 7"; with 5" CABC and grading; complete as specified Linear Feet 333.38 333.38 $32.50 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 2,720.39 2,720.39 $7.65 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 352.30 352.30 $8.55 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 20.00 20.00 $40.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 0.00 0.00 $0.01 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 0.00 0.00 $0.01 1590 Up-charge for late cold weather concrete sidewalk; complete as specified Cubic Yards 0.00 0.00 $0.01 Page 2 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-05 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1650 Locate existing property monuments; complete as specified Each 12.00 12.00 $250.00 1652 Replace existing property monuments; complete as specified Each 4.00 4.00 $50.00 1801 Base aggregate dense; 1- 1/4"; complete as specified Tons 1,470.00 1,470.00 $16.70 1802 Base aggregate dense; 3"; complete as specified Tons 819.00 819.00 $11.93 1900 Tack coat; complete as specified Gallons 30.00 30.00 $3.64 1901 HMA Pavement LT; complete as specified Tons 703.04 703.04 $89.08 1903 HMA cold weather paving; complete as specified Tons 36.11 36.11 $97.67 1960 Prepare foundation for asphaltic paving; complete as specified Lump Sum 1.00 1.00 $11,392.80 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 476.67 527.00 50.33 $6.50 $327.14 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 2.00 2.00 $150.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 0.00 0.00 $0.01 2004 Furnish and install 12" RCP Class III storm sewer; complete as specified Linear Feet 25.00 25.00 $82.00 2140 Furnish and install 12" RCP Class III apron endwall with joint ties; complete as specified Each 2.00 2.00 $1,420.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 6.00 6.00 $108.28 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 6.00 6.00 $12.02 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 2.00 $0.01 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 3,325.06 3,325.06 $2.12 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 8.00 8.00 $15.60 Page 3 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B CONTRACT 23-05 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 0.00 0.00 $5.13 2522 Furnish; install; maintain; and remove ditch check; complete as specified Each 6.00 6.00 $163.22 2638 Furnish and install turf reinforcement mat system; complete as specified Square Yards 430.00 430.00 $6.10 2648 Furnish and install medium rip-rap with filter fabric; complete as specified Square Yards 12.84 12.84 $73.20 2914 Storm sewer utility line opening (ULO); complete as specified Each 0.00 0.00 $850.00 2950 Excavation special (storm); complete as specified Tons 0.00 0.00 $0.01 SECTION I (BID ITEMS 1010 - 2950) - SUBTOTAL: $327.14 $0.00 NET INCREASE TO SECTION I: $327.14 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10001 Petroleum tank cleaning and disposal; complete as specified. Each 1.00 1.00 $3,360.00 $0.00 $0.00 $0.00 NET INCREASE TO SECTION I: $327.14 $0.00 NET INCREASE TO CONTRACT: $327.14 ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ADDITIONAL WORK: NET INCREASE: ADDITIONAL WORK REQUIRED: CO #1 SUBTOTAL: Page 4 of 4 Docusign Envelope ID: 6C1C049C-8DFB-40EF-9BA4-4FE9D2E97E8B