Loading...
HomeMy WebLinkAbout0110491-Building (ramp)OSHKOSH ON THE WATER .lob .Address 353 W 10TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner EARL H APEL Contractor D BELLMORE CONSTRUCTION Category 142 - Decks, Patios, Ramps No 110491 Create Date 09/14/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning R Class of Const: Size 43 LF Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block O Post ~ Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature SFR/Construct temporary ramp leading to existing porch in side yard, as per plans. All loads must transfer properly. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 09/14/2004 Final/O.P. 00/00/0000 Parcel Id # 0903440000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1070 COPRINUS CT GREEN BAY WI 54313 - 0000 Telephone Number 920-434-8181 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.