Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0103820-Building (garage)
OSHKOSH ON THE WATER Job Address 821 DOVE ST Designer Category Type Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WILLIAM/CHERYL MERKEL Create Date Contractor OWNER 149 ~ Raze detached garage, construct detached garage Plan · Building O Sign O Canopy O Fence (~ Raze Class of Const: Size No 103820 08/29/2003 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete C) Ficating Slab (~ Pier (~ Other O Concrete Block (~ Post C) Treated Wood Occupancy Permit Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures [] Projection Canopies 0 Signs 0 Use/Nature of Work ~FPJ Razing the existing garage and constructing a 24' x 24' detached garage. The ddveway is existing. HVAC Contractor Electric Contractor Fees: Valuation $7,500.00 Plan Approval Issued By: (~ $0.00 Permit Fee Paid [] Permit Voided j Plumbing Contractor $55.00 Park Dedication $0.00 Date 08/29/2003 Finat/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any ne~ssaw appreva[~ before/.~rting such/activity¢ " ' ~ Date Signature /~ Agent/Owner Address 821 DOVE ST OSHKOSH WI 54902 - 3326 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: PROPERTY OWNER/CONTRACTOR: ZONING CONSTRUCTION DATA: New Construction Addition Alteration TYPE OF CONSTRUCTION: COMPLIANCE CHECKLIST (i.e. fence, pool, parking lot, sign, etc.) J -~ J ~ 7~"~© · DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. ~APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: ~