Loading...
HomeMy WebLinkAbout0110451-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 317 W Contractor MERTEN Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 1 Site Drain 0 Roof Drain 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 110451 11TH AVE Owner JOSEPH TWASHBURN Create Date 09/10/2004 PLUMBING Category 411 - Residential-Water Heaters Plan Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 0 0 0 0 0 0 Use/Nature of Work INSTALL NG WTR HTR Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $620.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided Issued By Parcel Id # 0903710000 Date 09/10/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1076 COZY LN OSHKOSH WI 54901 - 0000 Telephone Number 231-6795 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.