HomeMy WebLinkAbout0110451-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 317 W
Contractor MERTEN
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 110451
11TH AVE Owner JOSEPH TWASHBURN Create Date 09/10/2004
PLUMBING Category 411 - Residential-Water Heaters Plan
Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve
Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn
Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
0
0
0
0
0
0
0
Use/Nature
of Work
INSTALL NG WTR HTR
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $620.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
0903710000
Date 09/10/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1076 COZY LN OSHKOSH WI 54901 - 0000 Telephone Number
231-6795
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.