Loading...
HomeMy WebLinkAbout23-02 CO #1 (FINAL)_8-20-24TO: CARL BOWERS & SONS CONST CHANGE ORDER #1 ( FINAL) N1844 MALONEY ROAD KAUKAUNA, WI 54130 Your present contract with the City of Oshkosh, Contract No. 23-02, awarded February 28, 2023, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($67,311.79) NET INCREASE TO ADDITIONAL WORK:$41,850.00 NET DECREASE TO CONTRACT ($25,461.79) SECTION I TOTALS BID TOTAL $4,036,254.95 $4,036,254.95 CO #1 ($25,461.79)($25,461.79) CONTRACT TOTAL $4,010,793.16 $4,010,793.16 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: AUGUST 20, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) 23-02 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1011 Clearing; complete as specified Inch Diameter 390.00 390.00 $38.00 1021 Grubbing; complete as specified Inch Diameter 390.00 442.00 52.00 $20.00 $1,040.00 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $140,000.00 1100 Removing pavement; complete as specified Square Yards 1,430.00 1,552.70 122.70 $5.00 $613.50 1110 Removing curb and gutter; complete as specified Linear Feet 4,700.00 4,608.20 -91.80 $3.00 ($275.40) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 34,300.00 33,150.96 -1,149.04 $0.60 ($689.42) 1200 Unclassified excavation; complete as specified Cubic Yards 4,400.00 4,328.80 -71.20 $16.00 ($1,139.20) 1220 Excavation special (paving); complete as specified Tons 650.00 0.00 -650.00 $0.01 ($6.50) 1301 7" concrete pavment; with 5" CABC and grading; complete as specified Square Yards 7,300.00 7,118.10 -181.90 $46.60 ($8,476.54) 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 1,160.00 1,239.30 79.30 $50.60 $4,012.58 1309 7" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 470.00 459.80 -10.20 $99.50 ($1,014.90) 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 350.00 243.80 -106.20 $78.50 ($8,336.70) 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 95.00 292.80 197.80 $82.50 $16,318.50 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 295.00 279.00 -16.00 $130.30 ($2,084.80) 1334 Concrete pavement gaps; complete as specified Each 3.00 3.00 $1,000.00 Page 2 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1335 Concrete pavement approach salb; HES complete as specified Square Yards 110.00 80.90 -29.10 $230.00 ($6,693.00) 1340 Crushed aggregate base course; complete as specified Tons 1,290.00 0.00 -1,290.00 $15.00 ($19,350.00) 1350 Pavement ties; complete as specified Each 130.00 114.00 -16.00 $8.00 ($128.00) 1352 Drilled dowel bars; 1"; complete as specified Each 63.00 44.00 -19.00 $13.00 ($247.00) 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 82.00 60.00 -22.00 $17.00 ($374.00) 1360 Adjust manholes and inlets; complete as specified Each 93.00 97.00 4.00 $375.00 $1,500.00 1370 Turf restoration; complete as specified Square Yards 4,300.00 4,581.07 281.07 $9.00 $2,529.63 1372 Restore gravel driveway/ apron; complete as specified Square Yards 230.00 232.00 2.00 $20.00 $40.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,430.00 0.00 -1,430.00 $0.01 ($14.30) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 280.00 0.00 -280.00 $0.01 ($2.80) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 800.00 820.40 20.40 $15.00 $306.00 1440 30" curb and gutter; 7": with 5" CABC and grading; complete as specified Linear Feet 300.00 287.60 -12.40 $48.00 ($595.20) 1460 Sidewalk curb; complete as specified Linear Feet 320.00 334.78 14.78 $45.00 $665.10 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 15,900.00 15,686.43 -213.57 $6.80 ($1,452.27) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 15,500.00 14,496.98 -1,003.02 $7.80 ($7,823.55) 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 480.00 1,351.40 871.40 $8.15 $7,101.91 1520 8" concrete sidewalk /driveway/ramp with 3" CABC and grading; complete as specified Square Feet 730.00 204.40 -525.60 $8.45 ($4,441.32) Page 3 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 350.00 797.40 447.40 $9.15 $4,093.71 1530 6" concrete step; complete as specified Square Feet 510.00 441.20 -68.80 $70.00 ($4,816.00) 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 480.00 470.10 -9.90 $32.00 ($316.80) 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 4,320.00 3,840.00 -480.00 $2.00 ($960.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 290.00 124.00 -166.00 $7.00 ($1,162.00) 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 5,100.00 1,184.30 -3,915.70 $0.01 ($39.16) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 1,800.00 0.00 -1,800.00 $0.01 ($18.00) 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 1,800.00 0.00 -1,800.00 $0.01 ($18.00) 1590 Up-charge for late cold weather concrete sidewalk; complete as specified Cubic Yards 95.00 18.80 -76.20 $0.01 ($0.76) 1600 Furnish and install tree; complete as specified Each 19.00 8.00 -11.00 $550.00 ($6,050.00) 1650 Locate existing property monuments; complete as specified Each 18.00 23.00 5.00 $150.00 $750.00 1652 Replace existing property monuments; complete as specified Each 18.00 23.00 5.00 $50.00 $250.00 1700 Sawing existing pavement; complete as specified Linear Feet 1,230.00 1,296.40 66.40 $2.00 $132.80 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 460.00 554.10 94.10 $3.00 $282.30 1900 Tack coat; complete as specified Gallons 45.00 0.00 -45.00 $8.00 ($360.00) 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 50.00 109.20 59.20 $60.00 $3,552.00 1911 4" asphaltic transition LT with 10" CABC and grading complete as specified Square Yards 580.00 824.00 244.00 $56.00 $13,664.00 Page 4 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 115.00 126.70 11.70 $54.00 $631.80 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 100.00 15.50 -84.50 $54.00 ($4,563.00) 1918 Asphaltic cold weather paving; complete as specified Square Yards 125.00 0.00 -125.00 $0.01 ($1.25) 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 32.00 90.00 58.00 $83.00 $4,814.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 659.40 631.00 -28.40 $75.00 ($2,130.00) 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 307.90 299.50 -8.40 $80.00 ($672.00) 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 289.20 278.00 -11.20 $85.00 ($952.00) 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 158.00 151.00 -7.00 $110.00 ($770.00) 2018 Furnish and install 27" storm sewer; complete as specified Linear Feet 140.00 97.00 -43.00 $113.00 ($4,859.00) 2024 Furnish and install 36" storm sewer; complete as specified Linear Feet 178.90 162.00 -16.90 $162.00 ($2,737.80) 2027 Furnish and install 42" storm sewer; complete as specified Linear Feet 197.60 180.00 -17.60 $185.00 ($3,256.00) 2030 Furnish and install 48" storm sewer; complete as specified Linear Feet 926.90 881.00 -45.90 $240.00 ($11,016.00) 2049 Furnish and install 24" x 38" HERCP Class III storm sewer; complete as specified Linear Feet 331.40 308.00 -23.40 $170.00 ($3,978.00) 2200 Furnish and install standard sanitary sewer manhole (2' diameter); complete as specified Vertical Feet 3.29 3.43 0.14 $600.00 $84.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 53.95 53.96 0.01 $500.00 $5.00 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 1.00 0.00 -1.00 $850.00 ($850.00) Page 5 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 32.76 33.16 0.40 $1,100.00 $440.00 2204 Furnish and install standard storm sewer manhole (7' diameter); complete as specified Vertical Feet 28.76 29.23 0.47 $1,350.00 $634.50 2205 Furnish and install standard storm sewer manhole (8' diameter); complete as specified Vertical Feet 7.56 6.70 -0.86 $1,700.00 ($1,462.00) 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as spcified Vertical Feet 19.43 16.97 -2.46 $600.00 ($1,476.00) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 41.00 40.00 -1.00 $2,700.00 ($2,700.00) 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 1,258.00 1,218.10 -39.90 $64.00 ($2,553.60) 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 74.00 131.00 57.00 $72.00 $4,104.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 86.00 85.00 -1.00 $30.00 ($30.00) 2406 Furnish and install storm sewer clay dams; complete as specified Each 43.00 42.00 -1.00 $100.00 ($100.00) 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 42.00 40.00 -2.00 $900.00 ($1,800.00) 2414 Storm lateral inlet adjustments; complete as specified Each 9.00 0.00 -9.00 $150.00 ($1,350.00) 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 67.00 67.00 $100.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 4.00 0.00 -4.00 $10.00 ($40.00) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 130.00 0.00 -130.00 $10.00 ($1,300.00) 2750 Rock excavation; complete as specified Cubic Yards 10.00 0.00 -10.00 $0.01 ($0.10) 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 169.00 170.00 1.00 $15.00 $15.00 Page 6 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 10.00 0.00 -10.00 $20.00 ($200.00) 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 786.50 860.00 73.50 $25.00 $1,837.50 2810 Abandon storm sewer manholes and inlets; complete as specified Each 1.00 0.00 -1.00 $400.00 ($400.00) 2812 Remove storm sewer manholes and inlets; complete as specified Each 22.00 22.00 $500.00 2850 Connect to existing storm sewer main; complete as specified Each 12.00 12.00 $800.00 2852 Connect to existing storm sewer lateral; complete as specified Each 4.00 2.00 -2.00 $200.00 ($400.00) 2856 Connect to existing storm sewer manhole; complete as specified Each 3.00 4.00 1.00 $500.00 $500.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 3.00 1.00 -2.00 $600.00 ($1,200.00) 2950 Excavation special (storm); complete as specified Tons 25.00 0.00 -25.00 $15.00 ($375.00) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 1,675.00 1,664.00 -11.00 $170.00 ($1,870.00) 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 570.00 589.00 19.00 $240.00 $4,560.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 30.00 24.00 -6.00 $260.00 ($1,560.00) 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 20.00 9.50 -10.50 $300.00 ($3,150.00) 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 30.50 30.12 -0.38 $500.00 ($190.00) 3062 Furnish and install 10" sanitary sewer drop; complete as specified Vertical Feet 6.00 5.21 -0.79 $550.00 ($434.50) 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 195.00 193.94 -1.06 $450.00 ($477.00) 3114 Furnish and install external sanitary sewer manhole chimney seal; complete as specified Each 15.00 18.00 3.00 $450.00 $1,350.00 Page 7 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3116 Furnish and install external sanitary sewer manhole chimney seal extension; complete as specified Each 2.00 0.00 -2.00 $425.00 ($850.00) 3136 Rebuild sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 9.00 8.33 -0.67 $500.00 ($335.00) 3160 Pour and reshape manhole bench; complete as specified Each 1.00 1.00 $1,000.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 36.00 35.00 -1.00 $300.00 ($300.00) 3212 Furnish and install 10" x 6" sanitary sewer factory wyes or tees; complete as specified Each 8.00 9.00 1.00 $350.00 $350.00 3214 Furnish and install 12" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 1.00 $500.00 3222 Furnish and install 6" sanitary sewer "Insert-A- Tee" or "Kor-N-Tee"; complete as specified Each 3.00 3.00 $1,200.00 3232 Furnish and install 6" sanitary sewer laterals (new); complete as specified Linear Feet 35.00 34.50 -0.50 $104.00 ($52.00) 3233 Furnish and install 6" sanitary sewer riser (new); complete as specified Linear Feet 9.00 6.50 -2.50 $110.00 ($275.00) 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 1,529.00 1,525.00 -4.00 $100.00 ($400.00) 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 201.00 137.40 -63.60 $106.00 ($6,741.60) 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 98.00 95.00 -3.00 $30.00 ($90.00) 3238 Furnish and install clay dams; complete as specified Each 49.00 46.00 -3.00 $100.00 ($300.00) 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 1.00 2.00 1.00 $1,600.00 $1,600.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 3.00 2.00 -1.00 $1,800.00 ($1,800.00) Page 8 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 2.00 2.00 $2,500.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 1.00 0.00 -1.00 $500.00 ($500.00) 3402 Furnish and install 8" sanitary sewer open cut casing pipes; complete as specified Linear Feet 110.00 100.00 -10.00 $150.00 ($1,500.00) 3600 Rock excavation; complete as specified Cubic Yards 25.00 0.00 -25.00 $150.00 ($3,750.00) 3700 Closed circuit televising; complete as specified Linear Feet 2,275.00 2,275.00 $2.00 3710 Closed circuit televising - using push camera; complete as specified Each 4.00 1.00 -3.00 $250.00 ($750.00) 3800 Abandon sanitary sewer manholes; complete as specified Each 2.00 0.00 -2.00 $400.00 ($800.00) 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 1,008.00 730.00 -278.00 $30.00 ($8,340.00) 3852 Remove sanitary sewer manholes; complete as specified Each 7.00 7.00 $800.00 3854 Remove sanitary sewer; complete as specified Linear Feet 380.00 380.00 $30.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 2.00 0.00 -2.00 $600.00 ($1,200.00) 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 30.00 29.50 -0.50 $126.00 ($63.00) 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 215.00 511.00 296.00 $155.00 $45,880.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 2,570.00 2,525.00 -45.00 $125.00 ($5,625.00) 4008 Furnish and install 12" ductile iron wtaer main (relay) with polywrap; complete as specified Linear Feet 12.00 8.00 -4.00 $200.00 ($800.00) 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 1,227.00 1,223.00 -4.00 $80.00 ($320.00) 4037 Furnish and install 1 1/4" water service (relay); complete as specified Linear Feet 70.00 63.00 -7.00 $86.00 ($602.00) Page 9 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4040 Furnish and install 2" water service (relay); complete as specified Linear Feet 28.00 15.00 -13.00 $100.00 ($1,300.00) 4048 Furnish and install 1" corporation and stop box; complete as specified Each 40.00 32.00 -8.00 $600.00 ($4,800.00) 4050 Furnish and install 1 1/4" corporation and stop box; complete as specified Each 2.00 2.00 $1,200.00 4053 Furnish and install 2" corporation and stop box; complete as specified Each 1.00 1.00 $1,800.00 4055 Furnish and install water service clay dams; complete as specified Each 43.00 35.00 -8.00 $100.00 ($800.00) 4056 Furnish and install connections to existing 4" water main; complete as specified Each 1.00 1.00 $1,800.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 6.00 6.00 $1,800.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 2.00 2.00 $2,000.00 4064 Furnish and install connections to existing 12" water main; complete as specified Each 2.00 1.00 -1.00 $2,800.00 ($2,800.00) 4101 Furnish and install 6" x 6" water main tee; complete as specified Each 1.00 1.00 $530.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 4.00 5.00 1.00 $720.00 $720.00 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 2.00 2.00 $735.00 4129 Furnish and install 12" x 8" water main tee; complete as specified Each 1.00 1.00 $1,150.00 4189 Furnish and install 8" x 8" water main cross; complete as specified Each 3.00 3.00 $1,000.00 4219 Furnish and install 8" 11 1/4 degree water main bend; complete as specified Each 1.00 1.00 $450.00 4228 Furnish and install 8" 22 1/2 degree water main bend; complete as specified Each 2.00 0.00 -2.00 $470.00 ($940.00) Page 10 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4235 Furnish and install 4" 45 degree water main bend; complete as specified Each 5.00 4.00 -1.00 $250.00 ($250.00) 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 28.00 22.00 -6.00 $330.00 ($1,980.00) 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 10.00 8.00 -2.00 $420.00 ($840.00) 4255 Furnish and install 8" water main cap; complete as specified Each 1.00 1.00 $275.00 4263 Furnish and install 8" x 4" water main reducer; complete as specified Each 1.00 1.00 $400.00 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 6.00 6.00 $420.00 4350 Cut and cap existing 4" water main; complete as specified Each 2.00 2.00 $800.00 4352 Cut and cap existing 6" water main; complete as specified Each 2.00 8.00 6.00 $800.00 $4,800.00 4354 Cut and cap existing 8" water main; complete as specified Each 2.00 0.00 -2.00 $900.00 ($1,800.00) 4401 Furnish and install 6" water main gate valve; complete as specified Each 5.00 7.00 2.00 $2,050.00 $4,100.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 20.00 22.00 2.00 $2,900.00 $5,800.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 2.00 1.00 -1.00 $5,000.00 ($5,000.00) 4500 Furnish and install hydrant; complete as specified Each 4.00 5.00 1.00 $5,800.00 $5,800.00 4712 Furnish and install 2" water main casing pipe; complete as specified Linear Feet 110.00 110.00 $125.00 4800 Rock excavation; complete as specified Cubic Yards 25.00 0.00 -25.00 $0.10 ($2.50) 4920 Remove water main; complete as specified Linear Feet 602.00 602.00 $25.00 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 23.00 21.00 -2.00 $1,750.00 ($3,500.00) 5019 Furnish and install pull box non-conductive; 24" x 42"; complete as specified Each 12.00 7.00 -5.00 $1,850.00 ($9,250.00) Page 11 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5025 Adjust pull box; complete as specified Each 33.00 28.00 -5.00 $5.00 ($25.00) 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 1.00 $2,000.00 5053 Install CITY-supplied fully- actuated 8-phase traffic signal control cabinet; complete as specified Each 1.00 1.00 $2,000.00 5054 Install electrical service; complete as specified Each 2.00 2.00 $2,250.00 5056 Remove and preserve light poles; bases; and lighting fixtures; complete as specified Lump Sum 1.00 1.00 $7,500.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 65.00 11.00 -54.00 $10.00 ($540.00) 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 3,285.00 3,259.00 -26.00 $14.00 ($364.00) 5170 3" Schedule 40 PVC bore; including bore pits and utility line openings; complete as specified Linear Feet 640.00 596.00 -44.00 $35.00 ($1,540.00) 5240 Furnish and install 6' gauge red-coated wire; complete a specified Linear Feet 3,800.00 3,669.00 -131.00 $1.40 ($183.40) 5241 Furnish and install 6 gauge black-coated wire; complete as specified Linear Feet 3,800.00 3,669.00 -131.00 $1.40 ($183.40) 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 3,200.00 3,148.00 -52.00 $1.50 ($78.00) 5260 Furnish and install 10 gauge red-coated wire; complete as specified Linear Feet 250.00 212.00 -38.00 $0.90 ($34.20) 5261 Furnish and install 10 gauge black-coated wire; complete as specified Linear Feet 250.00 212.00 -38.00 $0.90 ($34.20) 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 800.00 732.00 -68.00 $0.90 ($61.20) 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 860.00 780.00 -80.00 $0.80 ($64.00) 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 860.00 780.00 -80.00 $0.80 ($64.00) 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 860.00 780.00 -80.00 $0.80 ($64.00) Page 12 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5282 Furnish and install 14 gauge green-coated wire; complete as specified Linear Feet 150.00 130.00 -20.00 $1.00 ($20.00) 5300 Furnish and install 4 pair shielded CAT5; complete as specified Linear Feet 350.00 257.00 -93.00 $2.00 ($186.00) 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 875.00 889.00 14.00 $1.75 $24.50 5360 Furnish and install 14 AWG solid 3 conductor; complete as specified Linear Feet 150.00 120.00 -30.00 $2.00 ($60.00) 5362 Furnish and install 14 AWG solid 5 conductor; complete as specified Linear Feet 420.00 370.00 -50.00 $2.50 ($125.00) 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 1,600.00 1,471.00 -129.00 $4.75 ($612.75) 5380 Furnish and install fuse holder; complete as specified Each 42.00 34.00 -8.00 $55.00 ($440.00) 5386 Furnish and install 2A fuse; complete as specified Each 42.00 34.00 -8.00 $5.00 ($40.00) 5420 Install CITY-supplied 10' traffic signal pole with a pedestal base; complete as specified Each 8.00 6.00 -2.00 $250.00 ($500.00) 5421 Install CITY-supplied 13' traffic signal pole with a decorative base; complete as specified Each 4.00 5.00 1.00 $250.00 $250.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 1.00 2.00 1.00 $550.00 $550.00 5426 Install CITY-supplied 30' traffic signal pole with a transformer base; complete as specified Each 3.00 3.00 $750.00 5431 Install CITY-supplied 25' trombone arm; complete as specified Each 3.00 4.00 1.00 $750.00 $750.00 5434 Install CITY-supplied three- section traffic signal head; back plate; and LED modules; complete as specified Each 12.00 13.00 1.00 $550.00 $550.00 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 8.00 8.00 $350.00 Page 13 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02 CONTRACT 23-02 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5440 Install CITY-supplied pedestrian push button; complete as specified Each 8.00 11.00 3.00 $200.00 $600.00 5452 Install CITY-supplied 20' tapered pole with transformer base; complete as specified Each 19.00 17.00 -2.00 $550.00 ($1,100.00) 5458 Install CITY-supplied 10' truss-type luminaire arm; complete as specified Each 22.00 20.00 -2.00 $350.00 ($700.00) 5470 Install CITY-supplied cobra head luminaire; complete as specified Each 21.00 19.00 -2.00 $200.00 ($400.00) 5502 Furnish and install TYPE 2 base; complete as specified Each 16.00 15.00 -1.00 $1,150.00 ($1,150.00) 5504 Furnish and install TYPE 5 base; complete as specified Each 20.00 18.00 -2.00 $975.00 ($1,950.00) 5506 Furnish and install TYPE 9 base; complete as specified Each 2.00 2.00 $2,000.00 SECTION I (BID ITEMS 1011 - 5506) - SUBTOTAL: $147,602.33 ($214,914.12) NET DECREASE TO SECTION I: ($67,311.79) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-20000 Downtime to dig around UWO geothermal lines that were not located properly; complete as specified Each 0.00 4.50 4.50 $1,740.00 $7,830.00 1-30000 Stone & dumping 4' x 10' x 311'; complete as specified Lump Sum 0.00 1.00 1.00 $19,020.00 $19,020.00 1-40000 McKinley Street temporary water set up and installation; ten (10) laterals; complete as specified Lump Sum 0.00 1.00 1.00 $15,000.00 $15,000.00 $41,850.00 $0.00 $41,850.00 NET DECREASE TO SECTION I: ($67,311.79) $41,850.00 NET DECREASE TO CONTRACT: ($25,461.79) ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ADDITIONAL WORK: NET INCREASE: ADDITIONAL WORK REQUIRED: CO #1 (ITEMS 1-20000 - 1-40000) SUBTOTAL: Page 14 of 14 Docusign Envelope ID: 180EDADD-58C3-4A36-8B5D-63FCFB382B02