Loading...
HomeMy WebLinkAbout0110200-Building (garage)OSHKOSH ON THE WATER .lob Address 922 W 12TH AVE Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner KELLI C NUGENT Create Date Contractor OWNER 150 - New Accessory Buildings-Garages (Residential) Plan 110200 08/27/2004 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size 24' x 24' Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 578 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 1 Use/Nature SFR/Construct 24' x 24' detached garage in rear yard as per site plan, and pave driveway within 18 months as per site plan - min 6 inches off of Work property line. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $8,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $82.00 Park Dedication $0.00 Date 08/27/2004 Final/O.P. 00/00/0000 Parcel Id # 1305900000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 922W 12TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 50.04' 50.04' 50.04' 50.04' 50.04' T 50.0' 50.0' 50.0'