Loading...
HomeMy WebLinkAbout0110175-Building (combine suites S & T)OSHKOSH ON THE WATER .lob Address 2211 OREGON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner VTM ASSOCIATES LTD PARTNERSHIP Contractor BILL JOHNSON CONSTRUCTION INC Category 205 - Alteration Amusement, Social, Recreation No 110175 Create Date 08/26/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature 2211 S and T/ Alterations to remove two double door sets providing communication between suites S and T and infill with steel stud, drywall of Work ~valls. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $700.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 08/28/2004 Final/O.P. 00/00/0000 Parcel Id # 1410280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 6392 NESBITT RD MADISON WI 53719 - 0000 Telephone Number 608-271-1585 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.