HomeMy WebLinkAbout0110209-BuildingOSHKOSH
ON THE WATER
,Job Address 303 CEAPE AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH
Contractor CR MEYER
Category 260 - City of Oshkosh-New
No 110209
Create Date 08/27/2004
Plan M6-76-0804
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: 2Bibc Size Irreg
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 6227 Sq. Ft. Bedrooms 0 Stories 1 Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other
PILES
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 1
Use/Nature Amphitheater / New 6227 sf Amphitheater. 2406 sf performance stage, 3821 sf enclosed support building.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$700,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$0.00 Park Dedication $0.00
Date 08/27/2004 Final/O.P. 00/00/0000
Parcel Id #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 895W 20TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
920-235-3350 x219
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: CEAPE AVENUE, RIVERSIDE PARK BAND SHELL ZONING: C-3
PROPERTY OWNER/CONTRACTOR: CR MEYER / CITY
CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) NEW PARK, CONSTRUCT BAND SHELL
AND ASSOCIATED PARK FEATURES
COMPLIANCE CHECKLIST
DEFICIENT
f-] Use
Lot Width
[] Lot Area
[] Lot Area Per Family
[] Floodplain
[] Front Yard
[] Front Yard Side Street
COMMENTS:
DEFICIENT
[] Rear Yard
[] Side Yards
[] Building Area
[] Parking Standards
[] Off-Street Loading Standards
[] Vision Clearance
~. Transitional Yard Standards
[] Parking Lot Lighting
DEFICIENT
[] Landscape Standards
I-} Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
~ Mechanical Equip. Screening
[~ Other
Rooftop mechanical units, ground level mechanical units, and utilities shall be screened
from view from adjacent streets.
REVIEW AUTHORITY
Aa per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, excapt the
fo/lowing: (l) Alterations or interior work when the use is conforming and when no change in use is propoaed, (2) Maintenance items, e.g. s/ding, windows,
etc., when the use is conforming and when no change is proposed.
[ APPROVED [] DENIED
Plan Commission Action Required
BOA/Variance(s) Required
REVIEWED BY: Matt Tucker//'~
DATE: 812712004
2003