HomeMy WebLinkAbout0110176-Building (garage addition & remodel)OSHKOSH
ON THE WATER
.lob .Address 1160 N WESTFIELD ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner EVERGREEN MANOR INC
Contractor DAN V BINDER CONSTRUCTION
Category 111 - Single Family Addition
No 110176
Create Date 08/26/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size 14x24
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/14x24 garage addition, install new steel siding, replace all windows, remodel kitchen with new cabinetry.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$45,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$199.00 Park Dedication $0.00
Date 08/28/2004 Final/O.P. 00/00/0000
Parcel Id # 1608640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1224 W SOUTH PARK AVE OSHKOSH WI 54902 - 0000 Telephone Number 231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.