Loading...
HomeMy WebLinkAbout0110077-Building (siding garage only) � CITY OF OSHKOSH y � No 110077 c ti�� OSHKOSH BUILDING PERMIT -APPLICATION AND REC�R"�l � ON THE WATER � Job Address 317 E NEW YORK AVE Owner RONALD UELLEN MARSHALL �9� ate Date 08/19/2004 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy � Fence � Raze " Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection ' Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block 0 Post � Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 - - ----- --- - --- ' Use/Nature �FR/Install vinyl siding on garage only-No outside lights or electrical to be done. of Work � � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,464.44 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued Date 08/19/2004 Final/O.P. 00/00/0000 � Permit Voided Parcel ld# 1003270000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and ecure y necessa provals before starting such activiry. Signature c-��-�c�� /�����r—�"-� Date � / Q � � � — AgenVOwner Address 317 E NEW YORK AVE OSHKOSH WI 54901 - 3869 Telephone Number 9���3.3�- 6iE/ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.