MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Jon Urben, General Services Manager
DATE: September 27, 2024
RE: Grand Opera House Annex Renovation Update
As the Council may recall, last year the Grand Oshkosh (TGO) Foundation approached the City with a
proposal to renovate the Grand Opera House to expand both administrative and production areas. The
TGO estimated a $6M total budget for the project, and proposed this budget be funded 50/50 between
the City and TGO fundraising. In addition to renovations to improve the Grand’s administrative and
production areas, the project scope would also address various planned CIP facility projects including
updated lobby restrooms, enhanced ADA access, a new emergency generator, new windows and doors,
new theatre seats, a new stage hoist/speaker beam, wallpaper restoration, a new High Avenue front
façade restoration, and more. With the TGO fundraising study supporting the feasibility of their $3M
fundraising campaign, the Council authorized funding for design fees related to the renovation in the
2024 CIP. This design work included environmental site assessment/planning/coordination, surveying,
soil boring/evaluation and construction materials testing. The design work and environmental
assessment/planning began in early summer.
The initial project design intended to achieve the renovation goals by expanding the basement areas of
the Grand. However, upon review of the design in consideration of the pre-existing data of the site soil
and surrounding properties, it was determined through our environmental consultants that any design
requiring basement excavation would lead to a high probability of significant remediation costs for
treating contaminated soil and water throughout the project. With the concerns for excessive
remediation costs for any basement excavation, and with the potential for creating additional
environmental issues for the City as a result, it was the consensus of the project team that a lateral build-
out design on the existing Grand property with no basement would be a more prudent approach.
In light of this determination, the design team was then given direction to develop a lateral build-out
design within the original footprint of the Grand property, using available space on the west side of the
building. As the plan evolved, the design team discovered the lateral build-out design would require
addressing an approximate 20” existing grade difference between High Avenue and the west entrance
of the Grand. This grade difference creates multiple ADA accessibility/approach issues that cannot be
addressed within the existing property footprint. Additionally, to accommodate the program needs
laterally, the design places the main west entrance within 12’ of the adjacent private property, which then
creates pedestrian safety issues, vehicle drop off congestion concerns, and an awkward/cramped main
entrance to the Grand.
After much discussion, it was the recommendation of the design team that for a lateral build-out design
to address the 20” grade as well the various additional ADA and public safety issues, an attempt should
be made to explore the acquisition of the private property directly west of the Grand (Thompson
Photography) as well as the gravel lot (formerly Gunderson Cleaners). It was the consensus of the project
team that having these additional properties to west of the Grand would allow for a design that would
address all ADA/public safety/pedestrian drop off needs and create a more welcoming and appropriate
west entrance to the facility. Additionally, it was also felt this recommendation would help solidify the
Grand’s role as an important anchor for any future downtown development plans. As a result, the design
team was given direction to continue to refine the lateral build-out design, which is expected to require
additional funding beyond the recommended placeholders of $1 million in the 2025 CIP, $3 million in
the 2026 CIP, and $2 million in the 2027 CIP that staff originally projected for the proposed project.
The design team expects to have the revised design and project cost estimates completed by November
1st. It is our understanding that, during this same timeframe, the TGO and other community partners
will be exploring options and/or opportunities for the acquisition of the Thompson Photography and the
former Gunderson Cleaners parking lot properties, both of which the project team believe are necessary
components for the revised Grand plan to be successful.
Once the revised design and project costs are received and any property acquisition details are confirmed
by the TGO and community partners, the project team will report back to the Council. The project team
will be seeking Council direction on how to proceed with the TGO on any cost sharing specifics, timelines
and/ or schedules, which will then be incorporated into a Memorandum of Understanding between both
parties. Staff expects to schedule this next update with the Council before the CIP budget is adopted.
Please contact me or Assistant City Manager John Fitzpatrick if you have any questions in regard to this