Loading...
HomeMy WebLinkAbout0108026 P CITY OF OSHKOSH 108026 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address3240 JACKSON STOwnerNOVA COUNCELING SERVICESCreate Date05/10/2004 ContractorO'NEILL ENTERPRISE INCCategoryPlan 440 - Industrial-Interior Bathtub0Shower8Ejector/Grind0Dip Well0F Prep Sink0Gar Drain0 Whirlpool0Floor Drain6Water Softner0Drink Ftn0Serv Sink20 Soda Disp Lavatory120Local Waste1Wait. St.0Shamp Sink00 Lndry TrayCoffee Maker Toilet124Clothes Wshr0Ice Chest1Flr/Wst Sink0 0 Lndry Stndp Int Grease Trap Res. Sink20Bidet0Exam Sink0Catch Basin0 Disposal1 Ext Grease Trap Bar Sink011Wash Ftn0 Beer Tap0Sculry Sink Dishwasher RPZ Valve0 Water Heater302Urinal2 Sump PumpDent. Oper.0Hand Sink 0 Eye Wash Statn Site Drain000Standp Rec4 Classrm SinkLab Sink0Plaster Sink Roof Drain000Ice Maker0 Breakrm SinkSterilizer0Surgeons Sink Use/Nature of Work CBRF & COUNSELING CENTER SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 $0.00Permit Voided Valuation$48,000.00Plan ApprovalPermit Fees$434.00 Issued ByDate05/12/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address5575 CTY RD NPICKETTWI54964-0000Telephone Number920-428-4700 589-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.