HomeMy WebLinkAbout2003-Building (patio/hot tub)OSHKOSH
ON THE WATER
.lob .Address 2400 ABBEY AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES C/KlM E KUCKSDORF
Contractor OWNER
Category 142 - Decks, Patios, Ramps
No 103734
Create Date 08/27/2003
Plan
Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation (~ Poured Concrete O Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Constructing an irregular shaped patio in the rear yard (site plan on file) with hot tub. Seperate permit required for electric work.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,000.00 Plan Approval $0.00 Permit Fee Paid
$25.00 Park Dedication $0.00
Date 08/27/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 2400 ABBEY AVE
Agent/Owner
OSHKOSH
WI 54904 - 8080 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
OSHKOSH
ON THE WATER
Job Address
Designer
Category
Type
Zoning
2400 ABBEY AVE
142 - Decks, Patios, Ramps
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES C/KlM E KUCKSDORF
Contractor OWNER
· Building O Sign O Canopy O Fence .~_ Raze
Class of Const:
Create Date
Plan
Size
No 103734
08/27/2003
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
0 Sq. Ft. Bedrooms 0 Stories Canopies
0 Sq. Ft. Baths 0 Signs
Poured Concrete · Floating Slab (~) Pier (~ Other
Concrete Block (~ Post (~ Treated Wood
Flood Plain __ Height Permit
# Dwelling Units 0 # Structures 0
0
0
Use/Nature
of Work
SFR/ Constructing an irregular shaped patio in the rear yard (site plan on file) with hot tub. Seperate permit required for electric work,
HVAC Contractor
Electric Contractor
Plumbing Contractor
Fees: Valuation
Issued By: ~
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
$25.00 Park Dedication $0.00
Date 08/27/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within ;n e~ement, the Ci/~trongly urges the permit applicant to contact the easement
holder(s) and to secur./~ny necessaw, ap, ap~vals before stag such activity.
Signature ~ / ,~ ~,,.....,~ 7~ ,/,,.t~..~''/ Date
~ ~J - / %~ / Agent/Owner
Address 2400 ABBEY AVE ~ OSHKOSH WI 54904 - 8080 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.