Loading...
HomeMy WebLinkAbout0103720-Building (ramp in garage)OSHKOSH ON THE WATER .lob Address 1927 MCCURDY ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAELSKNUEPPEL Contractor PAUL KOWALSKI Category 142 - Decks, Patios, Ramps No 103720 Create Date 08/27/2003 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Constructing a ramp inside the garage. All work shall comply with applicable codes. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,800.00 Plan Approval $0.00 Permit Fee Paid $30.00 Park Dedication $0.00 Date 08/27/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 4762 BRAEMER CIR NEW FRANKEN WI 54229 - 0000 Telephone Number 920-707-4342 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Job Address Designer Category 1927 MCCURDY ST 142 - Decks, Patios, Ramps Type · Building (~ Sign Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL S KNUEPPEL Contractor PAUL KOWALSKI Canopy (~ Fence Class of Const: Create Date Plan (~ Raze Size No 103720 08/27/2003 Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~) Floating Slab (~) Concrete Block (~ Post Occupancy Permit Park Dedication Use/Nature of Work Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~) Pier O Other O Treated Wood Flood Plain __ Height Permit # Dwelling Units 0 # Structures [] Projection Canopies Signs 0 SFP,/ Constructing a ramp inside the garage. All work shall comply with applicable codes. 0 0 HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation Issued By: $2,600.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided $30.00 Park Dedication $0.00 Date 08/27/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessa~ approvals before starting such activity. Signature '~ /¢'/-~_,,/..J ~'t~¢_~ .¢-~__' Date ~ ¢,~/~'~ ..~ Agent/Owner ./ ' Address 4762 BRAEMER CIR NEW FRANKEN WI 54229 - 0000 Telephone Number 920-707-4342 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection Ps not performed within two business days from the time the project is ready.