HomeMy WebLinkAbout0110042 BOSHKOSH
ON THE WATER
.lob Address 1706 WISCONSIN ST
Designer
Category
CITY OF OSHKOSH No
BUILDING PERMIT - APPLICATION AND RECORD
Owner LEE D HASENOHRL Create Date
Contractor OWNER
150 - New Accessory Buildings-Garages (Residential) Plan
110042
08/18/2004
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: VB Size 26' x 30'
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies
Garage 780 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature SFR/Construct new 26' x 30' detached garage as per plans.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$8,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$82.00 Park Dedication $0.00
Date 08/18/2004 Final/O.P. 00/00/0000
Parcel Id # 1209680000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1706 WISCONSIN ST
Agent/Owner
OSHKOSH
WI 54901 - 2879 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.