Loading...
HomeMy WebLinkAbout0109974-Building (fence)OSHKOSH ON THE WATER .lob.Address 1744 OHIO ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner HERBERT L HAZEN Contractor RAMMER FENCE Category 251 - Fences No 109974 Create Date 08/12/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Poured Concrete Concrete Block Occupancy Permit Park Dedication 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size L~ Projection Canopies Signs Use/Nature SFR/ Constructing a 4' high chain link fence per attached site plan. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $844.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 08/12/2004 Final/O.P. 00/00/0000 Parcel Id # 1404750000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1433 Agent/Owner OSHKOSH WI 54903 - 1433 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: I ~ '~t'~ (::[~'~ C') ~ ZONING: PROPERTY OWNER/CONTRACTOR: ~c~r ~'~.C ~- CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST DEFICIENT [] Use [] Lot Width [] Lot Area Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street COMMENTS: DEFICIENT [] Rear Yard ~ Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. F- APPROVED [] DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: DATE: 2003 300.0' 46.4' 46.4' 552 546 49.49' 49.49'