Loading...
HomeMy WebLinkAbout0109908-Building (siding) r��N�O /�'� CITY OF OSHKOSH ,,,,� No �ossos ;_. OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD =�A��` ON THE WATER Job Address 1513 FOX ST Owner PAUL R ZUTZ Create Date 08/10/2004 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building _ � Sign � Canopy � Fence � Raze i Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height _ _0 Ft. ❑ Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block � Post � Treated Wood — Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 —-- -- -- -- __ _ -- Use/Nature �FR/Replacing the wood siding with vinyl siding on the house. Installing gutters and wrapping the soffit and fascia,replacing the porch ' of Work �f and replacing windows. �� i �-- -- —----- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,200.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 08/10/2004 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1600800000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure necessa approvals befor starting such activity. Signature Date ���/�.�-Q y AgenUOwner Address 1513 FOX ST OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service,Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may : continue if the inspection is not performed within two business days from the time the project is ready.