HomeMy WebLinkAbout0109899-Building (siding; roof; violations)
e
OSHKOSH
ON THE WATER
Job Address 342 W 14TH AVE
CITY OF OSHKOSH
No
109899
BUILDING PERMIT - APPLICATION AND RECORD
Owner
THOMAS C FRANCIS ETAL
Create Date
08/09/2004
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
Use/Nature
of Work
SFR/ Residing the house and wrapping the windows, repair and replace the rear decks/ exits with code compliant decks, replace roof, correct
all violations on correction notice.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$10,000.00
Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 08/09/2004
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 0904280000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
6415 E DECORAH AVE
Agent/Owner
OSHKOSH
WI 54902 - 7632 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.