HomeMy WebLinkAbout0109887-Building (siding & misc exterior repairs)
e
OSHKOSH
ON THE WATER
Job Address 307 MERRITT AVE
CITY OF OSHKOSH
No
109887
BUILDING PERMIT - APPLICATION AND RECORD
Owner
PROVIDENT BANK
Create Date
08/09/2004
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
Rental/ Repairing the porches, fix window in upper unit new garage doors, replace garage roof, replace siding and repair soffit and fascia.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,000.00
Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 08/09/2004
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 0400250000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1 E FOURTH STREET ML 198
Agent/Owner
CINCINNATI
OH 45202 - 0000 Telephone Number
751-0979
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.