HomeMy WebLinkAbout0110014-Building
e
OSHKOSH
ON THE WATER
Job Address 1127 TAFT AVE
CITY OF OSHKOSH
No
110014
BUILDING PERMIT - APPLICATION AND RECORD
Owner
JEFFREY KlJULIE KRAEMER
Create Date
08/16/2004
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
8 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
SFR/ Installing new kichen cabinets (the walls will not be opened), installing 6 replacement windows (same size and location), 4 exterior doors
and 2 interior doors (same size and location).
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$6,600.00
Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Issued By:
Date 08/16/2004
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1606160000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1127 TAFT AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.