HomeMy WebLinkAbout0109890 E
e
OSHKOSH
ON THE WATER
CITY OF OSHKOSH
No
109890
ELECTRIC PERMIT - APPLICATION AND RECORD
Job Address
608 E NEWYORKAVE
Owner
SCOTT P/SARA R MUHLBAUER
Create Date 08/09/2004
Contractor
HOMEOWNER
Category 612 - Residential-Single Family Addition/ReI
Plan
Service
10 New
0 Change
0 Temp
. N/A
Type
10 Overhead
0 Underground
Volts
Circuits
Fixtures
0
Amps
0
Switches
0
Receptacles
Appliances
Hydro-massage GFCI Protected on a 20A circuit
Use/Nature of SFR / Replace the original bathtub with a hydro-massage. No other wiring is being conducted.
Work
Fees: Valuation
$100.00
Plan Approval
$0.00
Permit Fee Paid
$20.00
Issued By:
Date 8/9/04
I I Permit Voided I
Parcelld # 1508200000
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
OSHKOSH
WI 5490 - 3940
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.