Loading...
HomeMy WebLinkAbout0109820 B e OSHKOSH ON THE WATER Job Address 2211 OREGON ST CITY OF OSHKOSH No 109820 BUILDING PERMIT - APPLICATION AND RECORD Owner VTM ASSOCIATES L TO PARTNERSHIP Create Date 08/05/2004 Designer Contractor TENANT Category 205 - Alteration Amusement, Social, Recreation Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 8 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Suite T / O'Marro's / Interior alterations to add a partition wall with double set doors.' Formerly The Winemaker. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $200.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 08/05/2004 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1410280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.