Loading...
HomeMy WebLinkAbout0103745-Building (fence)OSHKOSH ON THE WATER Job Address Designer Category Type Zoning 1130 N WESTFIELD ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner EVERGREEN MANOR INC Contractor RAMMER FENCE No 103745 Create Date 08/27/2003 251 - Fences Plan O Building O Sign O Canopy · Fence (~ Raze Class of Const: Size Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation (~) Poured Concrete (~ Floating Slab O Concrete Block · Post Occupancy Permit Not Required Park Dedication Rooms 0 Height 0 Ft. [] Projection J Bedrooms 0 Stories Canopies Baths 0 Signs (~ Pier (~) Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature {etirement Village/Install 232 tin ft of 4' tall chain link fence for a Daycare Playground on the east side of Eagle St. Install 80 lin ff of 6' of Work all cedar fence to shield view of loading docks. HVAC Contractor Electric Contractor Fees: Valua~4,100.00 Issued By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $20.00 Park Dedication $0.00 Date 08/27/2003 FinallO.P. 00/00/0000 In the performance of this work I agree to perform all work pumuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 3120 SHELDON DRIVE Agent/Owner OSHKOSH Wi 54904 - 0000 Telephone Number 233-2444 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. JOB LOCATION: ZONING/LAND USE COMPUANCE CHECKLIST PROPERTY OWNEPJCONTRACTOR: CONSTRUCTION DATA: '~New Construction ZONING, TYPE OF CONSTRUCTION: (i.e. fence, pool, parking tot, sign, etc.) COMPLIANCE CHECKLIST DEFICIENT Addition Alteration COMMENTS Use Lot Width Lot Ama Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc., when the use is conforming and when no change is proposed. ~' APPROVED DENIED Plan Commission Action Required Variance(s) Required