HomeMy WebLinkAbout0103701-BuildingOSHKOSH
ON THE WATER
Job Address 734 FREDERICK ST
Designer
Catego~J
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MATTHEW A MICHEL
Contractor OWNER
No 103701
Create Date 08/26/2003
140 - Intedor Remodeling Plan
· Building (~ Sign (~ Canopy _O Fence ~) Raze
Class of Const: Size
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft,
Foundation · Poured Concrete (~ Floating Slab
(~ Concrete Block (~ Post
Occupancy Permit
Park Dedication
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
(~ Pier (~) Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
IFPJ Remodeling the 2nd floor bathroom and bedroom to convert to a bathroom and laundry room. No structural work will be done.
HVAC Contractor
Plumbing Contractor WATTERS PLUMBING
Electric Contractor LARK ELECTRIC
Fees: Valuation $750.00
Issued By: ~.~'~
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
$20.00 Park Dedication $0.00
Date 08/26/2003 FinallO.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and.}<~ ~e/~e any~necess~.~ approvals be~re s~rting such activity. ~/~'/O~
Signature ( ~V~v~-.~,/'l/'[.~l.~/L.v// Date
Agent/Owner
Address 734 FREDERICK ST OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.