Loading...
HomeMy WebLinkAbout2004-Plumbing CITY OF OSHKOSH 109737 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address3265 S WASHBURN STOwnerBERGSTROM FOX VALLEY INCCreate Date08/03/2004 ContractorOGDEN PLUMBINGCategoryPlan 440 - Industrial-Interior Bathtub0Shower0Ejector/Grind0Dip Well0F Prep Sink0Gar Drain0 Whirlpool0Floor Drain3Water Softner0Drink Ftn0Serv Sink00 Soda Disp Lavatory12Local Waste0Wait. St.0Shamp Sink00 Lndry TrayCoffee Maker Toilet10Clothes Wshr0Ice Chest0Flr/Wst Sink0 0 Lndry Stndp Int Grease Trap Res. Sink00Bidet0Exam Sink0Catch Basin1 Disposal0 Ext Grease Trap Bar Sink000Wash Ftn1 Beer Tap0Sculry Sink Dishwasher RPZ Valve0 Water Heater200Urinal0 Sump PumpDent. Oper.0Hand Sink 1 Eye Wash Statn Site Drain000Standp Rec0 Classrm SinkLab Sink0Plaster Sink Roof Drain200Ice Maker0 Breakrm SinkSterilizer0Surgeons Sink Use/Nature Addition & remodel service garage of Work SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 1365010000 $0.00Permit Voided Valuation$20,000.00Plan ApprovalPermit Fees$98.00 Issued ByDate08/03/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 689NEENAHWI54957-0689Telephone Number836-3220 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.