Loading...
HomeMy WebLinkAbout2006-Plumbing (water heater) � � CITY OF OSHKOSH No 121612 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1717 NORTHPOINT ST Owner LEE H WINKLER ETAL Create Date 09/19/2006 Contractor SAMMONS PLUMBING Category 411 -Residential-Water Heaters Plan Bathtub Shower Water Softner Wait.St. Shamp Sink Coffee Maker -- -- Whirlpool Floor Drain Local Waste Ice Chest Fir/Wst Sink Int Grease Trap _ Lavatory ___ _ Lndry Tray Ciothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet _____ Sculry Sink Wash Ftn RPZ Valve Res.Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Sery Sink Soda Disp Misc. -- - Fixtures Use/Nature SFR/Replace gas water heater. '*DEBIT ACCT** — --_-- ----- — - - - __ _ � of Work , -- ------ -- — — _ � ; Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1514590000 Valuation $600.00 Plan Approval _ __.$0.00 Permit Fees $25.00 ❑ Permit Voided I Issued By �� Date 09/19/2006 In the performance of this work,1 agree to perform all worlc pursuant to rules governing the described construction. While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgentlOwner Address 522 W.MURDOCK AVE OSHKOSH WI 54901 -2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.