Loading...
HomeMy WebLinkAbout2004-Building (roof) /'� CITY OF OSHKOSH �A�'�'�c, No �oss�3 � zj10� OSHKOSH BUILDING PERMIT -APPLICATION AND RECO `� ON THE WATER Job Address 121 PROSPECT AVE Owner LEE J TRITT Create Date 07/27/2004 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building 0 Sign � Canopy 0 Fence � Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection ! Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature Res/Reroof-tear off existing,install new sheeting&roofing. Remove rear chimney. install new vinyl siding-tear offi existing,install 1/2 of Work �oam board,vinyl siding,wrap window casings&sills and soffiUfacial with aluminum. *Solar Electric i i I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuat $11,000.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00 Issued By: Date 07/27/2004 Final/O.P. 00/00/0000 � Permit Voided I Parcel Id#1007120000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construc6on. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit appliqtion within an easement,the City strongly urges the permit applicant to contact the easement hoider(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 270 SUNNYBROOK DR OSHKOSH WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service,Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.