HomeMy WebLinkAbout2004-Building (roof) /'� CITY OF OSHKOSH �A�'�'�c, No �oss�3
� zj10�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECO `�
ON THE WATER
Job Address 121 PROSPECT AVE Owner LEE J TRITT Create Date 07/27/2004
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building 0 Sign � Canopy 0 Fence � Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection !
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature Res/Reroof-tear off existing,install new sheeting&roofing. Remove rear chimney. install new vinyl siding-tear offi existing,install 1/2
of Work �oam board,vinyl siding,wrap window casings&sills and soffiUfacial with aluminum. *Solar Electric
i
i
I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuat $11,000.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00
Issued By: Date 07/27/2004 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id#1007120000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construc6on.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit appliqtion within an easement,the City strongly urges the permit applicant to contact the easement
hoider(s)and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address 270 SUNNYBROOK DR OSHKOSH WI 54904 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of
Inspection(i.e. Footing,Service,Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.