Loading...
HomeMy WebLinkAboutWashburn Street Tank Oshkosh, Wisconsin ---~-- 1,250,000 Gallon Hydropillar (Washburn Strèet Tank) City of Oshkosh Contract No. 04-05 Contract No. 49-71-06-01-04 June 17, 2004 Change Order No.1 All General Conditions and Infonnation for Bidders shall apply. This Change Order shall become a portion of the original Contract Documents. 1. . The following is a price adjustment (deduction) is for the design change on the manway: Original bid price for "Manway" was $8,300. Price adjustment (deduction) for the design change is: Two Thousand. Two Hundred Dollars ($2.200) 2. The following work shall be completed as additional to the ,contract: Increase the specified new wet interior ladder length from 20ft. to 29ft. Work to include installation of a new fall prevention device on the new section. Perform all other work per Item 3.21 - NEW LADDER found in Section 05000 - Metals. The contractor agrees to perfonn the work for the sum of: Two Thousand. Two Hundred Dollars $2.200 Original Contract Price: No 1 Deduct: No.2 Additional Work: Adjusted Contract Price: $174,400 - (2,200) 2.200 $174,400 Contract time remains the same. '~, APPROVALS: L?r. 4) v , ;p# 7/,ztJ/¡/ý IÝate Recommended by (Engineer): C/Z>~lf Date Accepted by (Contractor): Recommended: lJ~d C Rt-k Director of Public W rks 7- 2&,. 200'f By: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. APP~D 1t A~ ÞVn~ ity Attorney ~