1,250,000 Gallon Hydropillar (Washburn Strèet Tank)
City of Oshkosh Contract No. 04-05
Contract No. 49-71-06-01-04
June 17, 2004
Change Order No.1
All General Conditions and Infonnation for Bidders shall apply. This Change Order shall
become a portion of the original Contract Documents.
1.
. The following is a price adjustment (deduction) is for the design change on the
manway:
Original bid price for "Manway" was $8,300. Price adjustment (deduction) for
the design change is:
Two Thousand. Two Hundred Dollars
($2.200)
2.
The following work shall be completed as additional to the ,contract:
Increase the specified new wet interior ladder length from 20ft. to 29ft. Work to
include installation of a new fall prevention device on the new section. Perform
all other work per Item 3.21 - NEW LADDER found in Section 05000 - Metals.
The contractor agrees to perfonn the work for the sum of:
Two Thousand. Two Hundred Dollars
$2.200
Original Contract Price:
No 1 Deduct:
No.2 Additional Work:
Adjusted Contract Price:
$174,400
- (2,200)
2.200
$174,400
Contract time remains the same.
'~,
APPROVALS:
L?r.
4) v ,
;p#
7/,ztJ/¡/ý
IÝate
Recommended by (Engineer):
C/Z>~lf
Date
Accepted by (Contractor):
Recommended:
lJ~d C Rt-k
Director of Public W rks
7- 2&,. 200'f
By:
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
APP~D
1t A~ ÞVn~
ity Attorney
~