REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Asphalt Pavement, Driveway Aprons, Sanitary Sewer Main and
Laterals (New and Relay), and Water Main and Laterals (New and Relay) Relating to
Contract No. 23-16 Clairville Road assessments as per Wisconsin State Supreme Court
Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Driveway costs are assessed to the abutting property owner based on a
square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of bituminous pavement and
replacement of the sanitary sewer mains and laterals and water distribution mains
and laterals. The construction of a bituminous pavement will provide a rideable
surface available in all weather conditions. The utility laterals provide a
connection to the mains for each property. The sanitary sewer and water
distribution systems will provide a safe and reliable conveyance system for
wastewater and drinking water.
Estimated cost of the project is: $11,987,660.50
Proposed Assessments are: $452,334.93
City Cost of the project is: $11,535,325.57
I: \Engineering\2021 - 2030 Contracts\2023 CONTRACTS\23-16 Sawyer Crk Rural ll\Project_Information\Reports\Report of Director of PW \23-16 Criteria for Reasonableness and
Benefit 11-10-23.docx
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Asphalt Pavement, Driveway Aprons, Sanitary Sewer Main and
Laterals (New and Relay), Water Main and Laterals (New and Relay), and Storm Sewer
Mains and Laterals (New and Relay) Relating to Contract No. 23-09 assessments as per
Wisconsin State Supreme Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d
279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Driveway costs are assessed to the abutting property owner based on a
square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of bituminous pavement and
replacement of the sanitary sewer mains and laterals, storm sewer laterals, and
water distribution mains and laterals. The construction of a bituminous pavement
will provide a rideable surface available in all weather conditions. The proposed
pavement will be crowned to convey the storm water runoff to the storm sewer
system. The utility laterals provide a connection to the mains for each property.
The storm sewer system will convey the runoff away from the area. The sanitary
sewer and water distribution systems will provide a safe and reliable conveyance
system for wastewater and drinking water.
Estimated cost of the project is: $1,940,885.13
Proposed Assessments are: $441,779.92
City Cost of the project is: $1,499,105.21
1:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-03 Bradley St\Project_Information\Reports\Report of Director of PW\23-09 Criteria for Reasonableness and Benefit 6-2-
23.docz
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Concrete Pavement, Asphalt Pavement, Sidewalk (New and
Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay),
Water Main and Laterals (New and Relay), and Storm Sewer Mains and Laterals (New
and Relay) Relating to Contract No. 23-02 assessments as per Wisconsin State Supreme
Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Sidewalk and driveway costs are assessed to the abutting property owner
based on a square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of concrete or bituminous
pavement and replacement of the sanitary sewer mains and laterals, storm sewer
laterals, and water distribution mains and laterals. The construction of a concrete
or bituminous pavement will provide a rideable surface available in all weather
conditions. The proposed pavement will be crowned to convey the storm water
runoff to the storm sewer system. The utility laterals provide a connection to the
mains for each property. The storm sewer system will convey the runoff away
from the area. The sanitary sewer and water distribution systems will provide a
safe and reliable conveyance system for wastewater and drinking water.
Estimated cost of the project is: $4,036,254.97
Proposed Assessments are: $702,879.55
City Cost of the project is: $3,333,375.42
I:\Engineering\2021 - 2030 Contracts\2023 CONTRACTS\23-02 Lincoln-McKinley\Project_Information\ Reports\ Report of Director of PW \23-02 Criteria for Reasonableness and Benefit_6-
2-23.docx
(�bdocf'�5-01
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Concrete Pavement, Asphalt Pavement, Sidewalk (New and
Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay),
Water Main and Laterals (New and Relay), and Storm Sewer Mains and Laterals (New
and Relay) Relating to Contract No. 23-01 assessments as per Wisconsin State Supreme
Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Sidewalk and driveway costs are assessed to the abutting property owner
based on a square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of concrete or bituminous
pavement and replacement of the sanitary sewer mains and laterals, storm sewer
laterals, and water distribution mains and laterals. The construction of a concrete
or bituminous pavement will provide a rideable surface available in all weather
conditions. The proposed pavement will be crowned to convey the storm water
runoff to the storm sewer system. The utility laterals provide a connection to the
mains for each property. The storm sewer system will convey the runoff away
from the area. The sanitary sewer and water distribution systems will provide a
safe and reliable conveyance system for wastewater and drinking water.
Estimated cost of the project is: $2,861,414.40
Proposed Assessments are: $685,767.39
City Cost of the project is: $2,175,647.01
L \Engineering\2021 - 2030 Contracts\2023 CONTRACTS\23-01 Wisc St\Project_Information\Reports\Report of Director of PW \23-01 Criteria for Reasonableness and Benefit_6-2-23.docx
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Concrete Pavement, Asphalt Pavement, Sidewalk (New and
Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay),
Water Main and Laterals (New and Relay), and Storm Sewer Mains and Laterals (New
and Relay) Relating to Contract No. 23-07 assessments as per Wisconsin State Supreme
Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Sidewalk and driveway costs are assessed to the abutting property owner
based on a square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of concrete or bituminous
pavement and replacement of the sanitary sewer mains and laterals, storm sewer
laterals, and water distribution mains and laterals. The construction of a concrete
or bituminous pavement will provide a rideable surface available in all weather
conditions. The proposed pavement will be crowned to convey the storm water
runoff to the storm sewer system. The utility laterals provide a connection to the
mains for each property. The storm sewer system will convey the runoff away
from the area. The sanitary sewer and water distribution systems will provide a
safe and reliable conveyance system for wastewater and drinking water.
Estimated cost of the project is:
$2�327,891.20
Proposed Assessments are:
$482,747.76
City Cost of the project is:
$1,845;,143.44
I:\Engineering\2021 -2030 Contracts\2023 CONTRACTS\23-07 Wtr Mn Repl\Project_Information\Reports\Report of Director of PW\23-07 Criteria for Reasonableness and Benefit_62-
23.docx
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Storm Sewer Laterals Relating to Contract No. 23-20 assessments as per
Wisconsin State Supreme Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d
279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of storm sewer laterals. The storm
sewer laterals provide a connection to the mains for each property. The storm
sewer mains will convey the runoff away from the area.
Estimated cost of the project is: $830,256.73
Proposed Assessments are: $30,000.00
City Cost of the project is: $800,256.73
L\ Engineering\2021 - 2030 Contracts\2023 CONTRACTS\23-20 Mini Storm\ Project_Information\Reports\Report of Director of PW \23-20 Criteria for Reasonableness and Benefit_6-2-
23.docx
REGARDING THE CRITERIA OF REASONABLENESS AND BENEFIT
This report was prepared and submitted to satisfy the requirements that the City is
required to show that the assessments will benefit the properties assessed in the Special
Assessments for Concrete Pavement, Asphalt Pavement, Sidewalk (New and
Rehabilitation), Driveway Aprons, Sanitary Sewer Main and Laterals (New and Relay),
Water Main and Laterals (New and Relay), and Storm Sewer Mains and Laterals (New
and Relay) Relating to Contract No. 23-08 assessments as per Wisconsin State Supreme
Court Decision (Berkvam vs. the City of Glendale, 79 Wis. 2d 279.255 NW 251 (1979).
Criteria of Reasonableness
It is the opinion of this office that the assessments are, in fact, reasonable. The
assessments have been calculated in accordance with the City of Oshkosh Policy for
Special Assessments for assessing costs for street construction. All costs of the street
improvements have been assessed to the various parcels according to their
assessable frontage. Utility lateral costs are assessed to each lot needing lateral
work. Sidewalk and driveway costs are assessed to the abutting property owner
based on a square foot cost.
The Properties Against which the Assessments are Proposed are Benefited as
follows:
This improvement consists of the construction of concrete or bituminous
pavement and replacement of the sanitary sewer mains and laterals, storm sewer
laterals, and water distribution mains and laterals. The construction of a concrete
or bituminous pavement will provide a rideable surface available in all weather
conditions. The proposed pavement will be crowned to convey the storm water
runoff to the storm sewer system. The utility laterals provide a connection to the
mains for each property. The storm sewer system will convey the runoff away
from the area. The sanitary sewer and water distribution systems will provide a
safe and reliable conveyance system for wastewater and drinking water.
Estimated cost of the project is: $5,678,000.00
Proposed Assessments are: $1,097,923.90
City Cost of the project is: $4,580,076.10