CHANGE ORDER # 2
DATED: April 30, 2004
TO: James Cape & Sons Co.
6422 N. HWY 31
P. O. Box 044580
Racine, WI 54304-7012
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
03-03
, is hereby amended
NET DECREASE TO SECTION I - CONCRETE PAVING:
($40,755.08)
($40,755.08)
NET DECREASE TO CONTRACT:
Recommended:
JJ-J ~.~
Director of Public orks
Approved and accepted:
:I~~ -q~¡D9iI~
ontraétor r s-j; f
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Zß~a ~
Comptroller
CONTRACT: 03-03 CHANGE ORDER # 2
SECTION I . CONCRETE PAVING
DESCRIPTION
1. Approx. 6,850 square
yards of pavement
removal, complete as
soecified, oer sQuare vard 6,850.00 6,796.50 -53.50 $3.00 ($160.50
2. Approx. 59,950 square feet
of sidewalk and driveway
removal, compiete as
specified, per square foot
59,950.00 65,253.90 5,303.90 $0.58 $3,076.26
3. Approx. 23,300 cubic yards
of excavation, complete as
specified, per cubic yard ($2,510.00
23,300.00 22,798.00 -502.00 $5.00
4. Approx. 19,550 square
yards of 7" non-reinforced
concrete pavement,
includln9 integral curb and
grading (base in place),
complete as specified, per ($7,211.60)
SQuare vard 19,550.00 19,222.20 -327.80 $22.00
5. Approx. 30,750 square
yards of 7" non-reinforced
concrete pavement,
including integral curb, 5"
base material & grading,
complete as specified, per
sQuare vard 30,750.00 30,445.20 -304.80 $22.20 ($6,766.56)
6. Approx. 3,750 square
yards of 8" non-
reinforced concrete
pavement, including
integral curb, 6" base
material & grading,
complete as specified, per ($707.20'
SQuare vard 3,750.00 3,724.00 -26.00 $27.20
7. Approx. 1,250 square
yards of 8" non-
reinforced concrete
pavement H.E.S., Including
integral curb, 6" base
material & grading,
complete as specified, per
sQuare vard 1,250.00 1,504.10 254.10 $35.60 $9,045.96
8. Approx. 250 square yards
of 8" reinforced
concrete pavement,
including integral curb, 6"
base materiai & grading,
complete as specified, per
SQuare vard 250.00 275.00 25.00 $28.00 $700.00
Page 1
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET CDSTPER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
9. Approx. 1,965 linear feet of
12" wide radius curb head,
complete as specified, per
linear foot 1,965.00 2,415.50 450.50 $3.21 $1,446.11
10. Approx.100 iinearfeetof
standard 24" curb & gutter,
compiete as specified, per
iinearfoot 100.00 159.50 59.50 $14.90 $886.55
11. Approx. 1,350 linear feet of
standard 30" curb & gutter,
complete as specified, per
linear foot 1,350.00 1,420.10 70.10 $13.78 $965.98
12. Approx. 130 linear feet of
6" x 12" curb, complete as
specified, per linear foot
130.00 122.00 -8.00 $13.26 ($106.08
13. Approx. 195 linear feet of
standard 36" curb & gutter
(mountable), complete as ($156.25
specified, ner linear foot 195.00 184.70 -10.30 $15.17
14. Approx. 29,200 square feet
of 4" concrete
sidewalk, complete as
specified ner sQuare foot 29,200.00 33,072.30 3,872.30 $2.28 $8,828.84
15. Approx. 57,625 square feet
of 6" concrete
sidewalk & driveway,
complete as specified, per
SQuare foot 57,625.00 57,710.20 85.20 $2.62 $223.22
16. Approx. 70 square feet of
6" concrete steps,
complete as specified, per
SQuare foot 70.00 82.30 12.30 $30.00 $369.00
17. Approx. 155 square yards
of 3" thick asphaltic
concrete driveway,
compiete as specified, per
sQuare yard 155.00 146.30 -8.70 $27.00 ($234.90
18. Approx. 2,750 square
yards of 3" asphaltic
concrete transition,
complete as specified, per
SQuare yard 2,750.00 2,018.60 -731.40 $17.34 ($12,682.48
19. Approx. 2,375 square
yards of 5" asphaltic
concrete transition,
complete as specified, per
SQuare yard 2,375.00 2,299.60 -75.40 $17.77 ($1,339.86)
20. Approx. 425 square yards
Qf 2" asphaltic
CQncrete pavement over 8"
concrete base course,
compiete as specified, per
souare yard 425.00 412.20 -12.80 $39.10 ($500.48
Page 2
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
21. Approx. 70 tons of
asphaltic concrete binder
material, compiete as ($279.82)
specified, oer ton 70.00 63.20 -6.80 $41.15
22. Approx. 60 tons of
asphaltic concrete surface
material, complete as
specified, per ton 60.00 64.17 4.17 $43.95 $183.27
23. Approx. 17 gallons of tack
or prime coat, complete as
specified, per callan 17.00 15.10 -1.90 $10.10 ($19.19
24. Approx. 630 square yards
of asphaltic pavement
milling, complete as
soecified, ner sQuare yard 630.00 602.50 -27.50 $5.30 ($145.75
25. Preparation of foundation
for asphalt paving on
Cleveland Avenue,
complete as specified,
lump sum 1.00 1.00 $928.00
26. Furnish and install approx.
8,600 tons of crushed
stone base course,
complete as specified, per
ton 8,600.00 2,560.76 -6,039.24 $6.58 ($39,738.20
27. Approx. 4,030 linear feet of
sawing, cornplete as ($47.42
soecified, ner linear foot 4,030.00 4,002.90 -27.10 $1.75
28. Furnish and install approx.
405 pavernent ties,
complete as specified,
each 405.00 414.00 9.00 $6.00 $54.00
29. Adjust approx. 295
manholes and inlets,
complete as specified,
each 295.00 280.00 -15.00 $357.15 ($5,357.25)
30. Furnish and install approx.
840 linear feet of No.4
reinforcing bars, complete
as specified, per linear foot
840.00 1,500.00 660.00 $0.75 $495.00
31. Remove approx. 205 linear
feet of railroad rails and
ties, complete as specified,
er linear foot 205.00 213.00 8.00 $6.00 $48.00
32. Furnish and install approx.
16 trees, complete as
specified, each
16.00 4.00 -12.00 $250.00 ($3,000.00
33. Remove approx. 390 I.D.
of trees and stumps,
complete as specified, per
inch diameter 390.00 376.00 -14.00 $20.15 ($282.10
Page 3
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
34. Remove approx. 26 I.D. of
stumps, complete as
specified, per inch ($5.76)
diameter 26.00 24.00 -2.00 $2.88
35. Terrace work on Central
Street, complete as
specified, lump sum 1.00 1.00 $2,275.68
36. Terrace work on Cherry
Park Court, complete as
soecified, lump sum 1.00 1.00 $8,083.40
37. Terrace work on Cleveland
Avenue, complete as
specified, lumo sum 1.00 1.00 $89.88
38. Terrace work on
Farmstead Lane, complete
as specified, lump sum
1.00 1.00 $4,776.88
39. Terrace work on Frederick
Street, complete as
soecified, lumo sum 1.00 1.00 $4,049.24
40. Terrace work on
Greenbriar Court, complete
as specified, lump sum
1.00 1.00 $1,802.00
41. Terrace work on Grove
Street, complete as
specified, lump sum 1.00 1.00 $9,161.16
42. Terrace work on Guenther
Street, complete as
specified, lumn sum 1.00 1.00 $9,316.32
43. Terrace work on
Hearthstone Drive,
complete as specified,
lump sum 1.00 1.00 $3,889.36
44. Terrace work on Ida
Avenue, complete as
specified, lumn sum 1.00 1.00 $707.04
45. Terrace work on Melvin
Avenue, complete as
specified, lump sum 1.00 1.00 $2,604.16
46. Terrace work on Minnesota
Street, complete as
specified, lump sum
1.00 1.00 $6,598.60
47. Terrace work on Park
Ridge Avenue, complete
as sDecified, lumn sum 1.00 1.00 $954.20
48. Terrace work on Parkway
Avenue, complete as
soecified, lumD sum 1.00 1.00 $901.52
49. Terrace work on Sharratt
Drive, complete as
sDeclfied lumD sum 1.00 1.00 $3,014.24
Page 4
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COSTPER INCREASE IN DECREASE IN
DESCRIPTION CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
50. Terrace work on State
Street, complete as
sDecified, lumo sum 1.00 1.00 $2,233.80
51. Terrace work on Vinland
Street, complete as
sDecified, lumo sum 1.00 1.00 $3,618.00
52. Terrace work on
Weatherstone Drive,
complete as specified,
lump sum 1.00 1.00 $3,059.00
53. Terrace work on W. 18th
Avenue, complete as
specified, lump sum 1.00 1.00 $2,565.04
54. Terrace work on W. 20th
Avenue railroad crossing,
complete as specified,
lump sum 1.00 1.00 $1,304.88
55. Provide $375.00 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.00 1.00 $375.00
SECTION I - (BID ITEMS 1 - 55) - SUB-TOTALS
$26,322.19 ($81,251.40)
ADDITONAL WORK REQUIRED: C.O. # 2 - SECTION I
DESCRIPTION
1 Loading, hauling and
tipping fees for railroad ties
@ Frederick Street & Irving
Avenue intersection, lump
sum 1.00 1.00 $900.00 $900.00
2 Loading, hauling and
tipping fees for railroad ties
on 18th Avenue, lump sum
1.00 1.00 $1,483.07 $1,483.07
3 Handling contaminated
soils on State Street, lump
sum 1.00 1.00 $1,490.20 $1,490.20
4 Additional topsoil and
landscaping @ 4085
Sharratt Drive, lump sum 1.00 1.00 $402.00 $402.00
Page 5
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
16 Landscaping at the
intersection of Bismarck
Avenue & Sawyer Street
due to extension of
construction limits, lump
sum 1.00 1.00 $289.02 $289.Q2
ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 -16) - SUB.TOTAL
$14,174.13
$0.00
($40,755.08)
NET DECREASE TO SECTION 1-
NET INCREASE TO SECTION I
NET DECREASE TO SECTION I
$40,496.32
($81,251.40)
($40,755.08)
NET DECREASE TO CONTRACT:
Page 7
CONTRACT: 03-03 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
5 Clearing and grubbing
vision triangle @
southwest corner Cherry
Park Court & U.S.H. "45",
lumn sum 1.00 1.00 $3,050.00 $3,050.00
6 Provide and install erosion
mat @ U.S.H. "45" &
Cherry Park Court
drainage ditches, per
snuare "ard 184.50 184.50 $2.01 $370.85
7 Additional topsail and
landscaping on Cleveland
Avenue due to additional
curb and gutter removed,
lumn sum 1.00 1.00 $560.73 $560.73
8 Additonal topsoil,
iandscaping and erosion
mat on Frederick Street
west side from Parkway
Avenue to Ida Avenue,
lumn sum 1.00 1.00 $1,268.06 $1,268.06
9 Additional landscaping for
two (2) sanitary laterals @
Minnesota Street and 18th
Avenue, lumn sum 1.00 1.00 $453.35 $453.35
10 Root pruning additonal
trees for sidewalk
installation on Vinland
Street. lumn sum 1.00 1.00 $112.50 $112.50
11 Curb cuts on Vinland
Street, W. Parkway
Avenue and Hearthstone
Drive, lumn sum 1.00 1.00 $678.50 $678.50
12 Five (5) cubic yards of
slurry to fill in 10 linear feet
of abandoned 48" storm
sewer on 24th Avenue @
railroad crossing, per cubic
yard 5.00 5.00 $85.00 $425.00
13 200 tons of salvaged base
course hauled & placed on
Cherry Park Court, per ton 200.00 200.00 $3.50 $700.00
14 Breakdown and reset
paving forms for west half
of State Street, lumo sum 1.00 1.00 $1,193.72 $1,193.72
15 Extra labor & materials to
excavate and place gravel
at the intersections of 17th
Avenue & 18th Avenue@
Minnesota Street, in lieu of
excavation & asphalt
transition item, lump sum 1.00 1.00 $797.13 $797.13
Page 6