Loading...
HomeMy WebLinkAbout2003-Building (driveway)No 103686 CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1303 PUNHOQUA ST Owner SHIRLEY M WHITEHURST Create Date 08/25/2003 Designer Contractor OWNER Category 258 - Parking Lots, Driveways Plan Type · Building ~) Sign O Canopy ~) Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection I Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete ~ Floating Slab O Pier (~ Other (~) Concrete Block ~) Post O Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature SFPJ Replacing the existing driveway with concrete 29' x 24'. The driveway shall not exceed the width of the garage or 24' (whichever is of Work less) at the front property line. HVAC Contractor Electric Contractor Fees: Valuation $1.800.00 Issued By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided I Plumbing Contractor $25.00 Park Dedication $0.00 Date 08/25/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contac[ the easement holder(s) and to secure ,any nege,~sary apprqvals ~)efore starting such activity. Signature ~, ~/ ~/~.~ ,~f ~,~ Date j~ ~/3' ~-~S ~- ~z AgenFOwaer Address 1303 PUNHOQUA ST OSHKOSH WI 54902 - 2642 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.