HomeMy WebLinkAbout2003-Building (driveway)No 103686
CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1303 PUNHOQUA ST Owner SHIRLEY M WHITEHURST Create Date 08/25/2003
Designer Contractor OWNER
Category 258 - Parking Lots, Driveways Plan
Type · Building ~) Sign O Canopy ~) Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection I
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation · Poured Concrete ~ Floating Slab O Pier (~ Other
(~) Concrete Block ~) Post O Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
0
0
Use/Nature SFPJ Replacing the existing driveway with concrete 29' x 24'. The driveway shall not exceed the width of the garage or 24' (whichever is
of Work less) at the front property line.
HVAC Contractor
Electric Contractor
Fees: Valuation $1.800.00
Issued By:
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided I
Plumbing Contractor
$25.00 Park Dedication $0.00
Date 08/25/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contac[ the easement
holder(s) and to secure ,any nege,~sary apprqvals ~)efore starting such activity.
Signature ~, ~/ ~/~.~ ,~f ~,~ Date j~ ~/3' ~-~S ~- ~z
AgenFOwaer
Address 1303 PUNHOQUA ST OSHKOSH WI 54902 - 2642 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.