CHANGE ORDER #
DATED: May 4,2004
TO: Twins Excavating, Inc.
P. O. Box 183
Kewaunee, WI 54216
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
03-19
, is hereby amended
NET INCREASE TO SECTION I - STORM SEWER:
NET DECREASE TO SECTION II - SANITARY SEWER:
$4,842.51
($3,200.50)
$1,642.01
NET INCREASE TO CONTRACT:
Recommended:
j)~J c..~~1<.
Director of Public orks
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
z.(1,J",J) a ~4J
Comptroller
CONTRACT: 03-19 CHANGE ORDER # 1
SECTION 1- STORM SEWER
DESCRIPTION
1. Reconstruct approx. 1,025
linear feet of reinforced
concrete box culvert, re-
use existin9 base,
complete as specified, per
linear foot 1,025.00 1,037.50 12.50 $289.25 $3,615.63
2. Furnish and install approx.
10 linear feet of 12" Storm
Sewer Relay, cornplete as
specified, per linear foot
10.00 10.00 $36.00
3. Reconstruct approx. eight
(8) storm manhoies, re-use
existing base and casting,
cornplete as specified,
each 8.00 7.00 -1.00 $1,380.00 ($1,380.00)
4. Provide $375.00 to the City
of Oshkosh for project
managernent
communications, complete
as specified, lump sum
1.00 1.00 $375.00
SECTION I. (BID ITEMS 1.4) .SUB.TOTALS
$3,615.63 ($1,380.00)
ADDITONAL WORK REQUIRED: C.O. # 1 . SECTION I
DESCRIPTION
1 Furnish and install 24"
PVC storm sewer, per
iinear foot 40.00 40.00 $48.75 $1,950.00
2 Cut hoie in storrn sewer
culvert for 24" PVC pipe,
lump sum 1.00 1.00 $375.00 $375.00
3 New storm manhole @
10th Avenue, east side of
box cuivert, iump sum 1.00 1.00 $1,240.00 $1,240.00
4 Cost per foot to increase
steei in pre-cast top
sections, per linear foot 1,037.50 1,037.50 $2.45 $2,541.88
5 Credit for landscaping, ($3,500.00
lump sum 1.00 1.00 ($3,500.00)
ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 .5). SUB.TOTAL
$2,606.88
$0.00
NET INCREASE TO SECTION I .
$4,842.51
Page 1
CONTRACT: 03-19 CHANGE ORDER # 1
DESCRIPTION
SECTION II. SANITARY SEWER
DESCRIPTION
5. Reconstruct approx. two
(2) sanitary manhole, re-
use existing base,
complete as specified,
each 2.00 0.00 -2.00 $1,600.25 ($3,200.50)
SECTION II. (BID ITEM. 5). SUB.TOTALS
NET DECREASE TO SECTION II
$0.00 ($3,200.50)
($3,200.50)
NET INCREASE TO SECTIONS I, II
NET DECREASE TO SECTIONS I, II
$6,222.51
($4,580.50)
$1,642.01
NET INCREASE TO CONTRACT:
Page 2