Loading...
HomeMy WebLinkAboutPW CNT 02-07/Cng Ord #1 -- .. ;, sa. STRAND ASSOC'ATES, 'NC' ~~ ENG'NEEOS Strand Associates, Inc. Mad,son, WI Joliet, IL Louisville, KY Subsidiary Offices PEH KY Division Offices SIECO Columbus, IN Lancaster. OH TAt Mobile, AL www.strand.com July 17, 2003 CHANGE ORDER NO. I PROJECT: OWNER: CONTRACT: CONTRACTOR: Waukau Avenue Pump Station and Force Main Upgrades City of Oshkosh 02-07 Charles O. Green, Inc. Description of Change CHANGE the quantity of Bid Item No.3, DEDUCT Relocate Existing Sanitary Sewer Lateral ITom 60 LF to 0 LF at the unit price bid of $60/LF. CHANGE the quantity of Bid Item No.4, DEDUCT Relocate Existing Water Service ITom 40 LF to 0 LF at the unit price bid of$20/LF. CHANGE the quantity of Bid Item No.5, DEDUCT Relocate Existing Water Main ITom 20 LF to 0 LF at the unit price bid of$150/LF. . ADD the lump sum price of $1,540.00 for ADD costs associated with replacing the pump cable conduit. ADD the lump sum price of $2,320.00 for ADD costs associated with extending the control panel concrete pad and stainless steel screen. ADD the lump sum price of $1,707.21 for ADD costs associated with providing four additional fittings to route force main discharge piping ITom the wet well manhole to the new valve manhole. TOTAL VALUE OF THIS CHANGE ORDER: ($3,600.00) la Ib ($800.00) Ie ($3,000.00) Id $1,540.00 Ie $2,320.00 If $1,707.21 DEDUCT ($1,832.79) Contract Price Adjustment Original Contract Price $110,245.00 $0.00 Previous Change Order Adjustments '. ". sa. STRAND ASSOO'ATES, 'NO' ENG'NEEOS City of Oshkosh - Charles O. Green, Inc. Contract 02-07, Change Order No.1 Page 2 July 17, 2003 Adjustment in Contract Price this Change Order ($1,832.79) Current Contract Price including this Change Order $108,412.21 Contract Completion Date Adjustment Original Contract Completion Date Contract Completion Date Adjustments due to previous Change Orders Contract Completion Date Adjustments due to this Change Order Current Contract Completion Dates including all Change Orders September 30, 2002 0 Days 365 Days September 30, 2003 ent to the Contract and all provisions will apply REC Øþ~jL? Date ENG APê~l~ CONTRACTOR - Charles O. Green, Inc. ~-3J-O3 Date ...J' ý -oy Date I certify that provision has been ade to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~~r~ Comptroller ~, ~JJa~ , Cit ttorney A^:-,g'1~'02 0'8:02a Charles O. Green 920-734-6648 p.2 1701 S. Douglas Street Appleton. Wisconsin 54914 GBo,§§N 920 Phone # (Rx1ð 734-66St! Fax # (XX4<J~ 920 734-6648 Public Utility Contractor August 12, 2002 RyaN T. Amtmann strand Associates 910 W. Wingra Drive Madison, WI 53715 RE: waukau Ave. Pump Station The following is what we received from Baenen Electric for the additional work that you requested. Labor Including Travel Material Miscellanous Expenses $ 1,090.00 310.00 140.00 $ 1,540.00 Yours truly, CHARLES O. GREEN, INC. ./'f 7 ~.:-:-/ .,,""--- .:..---.. - - -".. ..~----. . ./.~ /" ?~~-'/ .~~ ,/ -Cftfi-l"Bs>D. Greerr DC~ ' 1. 2°\32 2: 19PM BAENEN ELECTRIC GREEN BAY OFFICE NO. 55O P.Ul ;' . ,~ BAENEN ELECTRIC SERVICE INC. 18/0 Cofrin Drive Green Bay, WI 54302 (920) 468.8244 (920) 468-3430 Fax September 23, 2002 Ðec;trical Contractor Strand Associates 910 West Wingra Drive Madison, WI 53715 Attn: Shane Zenz Re: Waukau Lift Station Electrical Quote for additional work at waukau pump station project - Oshkosh. 1,) Relocate 'j.," control conduits from existi.D.g control cabinet to new control cabinet 2.) Extend concrete pads and stainless steel mesh screen under new control cabinet Material: ~ 800.00 . 4x8 88 Mesh 1-5/6" S8 strut channel 88 Anchors . 88 Fastners . W' PVC coated GRC HW conduit . %" pva coated GRC rigid couplings Concrete Pad Extension Labor (with travel) Equipment Piau $1320.00 $25.00 $175.00 Total: $2,320.00 - Two Thousand Three Hl.1ndred Twenty Dollars. Sincerely, Craig Johan6Bn Craig Johansen Baenen Electric Service, Inc. . Industrial . Commercial . Residential . Aerial Ladder . Trenching 1701 S. Douglas Street Appleton. Wisconsin 54914 G~,§§N 920 Phone # ~X) 734-6688 Fax # P4.) ),~mw;gaæ 920 734-6648 l . STRAND ASSOÇíATF:-'::~C.' August 12, 2002 . Ryan .T. Amtmann Strand Associates 910 W. Wingra Drive Madison, WI 53715 RE: WaukauAve. Pump Station Oshkosh r The following is the extra work due to the alignment of the existing pumps in the wet well. The holes had to be made larger in the wet well and extra bends (4 each) with Meg-a- lugs had to be used to connect the pipes. Labor: Equipment: Material: $ 660.20 322.73 724.28 Total Due: $ 1707,21 Yours truly, CHARLES"O,',. GREEN ",}r:5. . ~~~?~ - ,./ <~~ ;;:;¿;. ~-¿---- Charles 0, Gréen