July 17, 2003
CHANGE ORDER NO. I
PROJECT:
OWNER:
CONTRACT:
CONTRACTOR:
Waukau Avenue Pump Station and Force Main Upgrades
City of Oshkosh
02-07
Charles O. Green, Inc.
Description of Change
CHANGE the quantity of Bid Item No.3, DEDUCT
Relocate Existing Sanitary Sewer Lateral
ITom 60 LF to 0 LF at the unit price bid of
$60/LF.
CHANGE the quantity of Bid Item No.4, DEDUCT
Relocate Existing Water Service ITom 40 LF
to 0 LF at the unit price bid of$20/LF.
CHANGE the quantity of Bid Item No.5, DEDUCT
Relocate Existing Water Main ITom 20 LF to
0 LF at the unit price bid of$150/LF. .
ADD the lump sum price of $1,540.00 for ADD
costs associated with replacing the pump
cable conduit.
ADD the lump sum price of $2,320.00 for ADD
costs associated with extending the control
panel concrete pad and stainless steel screen.
ADD the lump sum price of $1,707.21 for ADD
costs associated with providing four
additional fittings to route force main
discharge piping ITom the wet well manhole
to the new valve manhole.
TOTAL VALUE OF THIS CHANGE ORDER:
($3,600.00)
la
Ib
($800.00)
Ie
($3,000.00)
Id
$1,540.00
Ie
$2,320.00
If
$1,707.21
DEDUCT
($1,832.79)
Contract Price Adjustment
Original Contract Price
$110,245.00
$0.00
Previous Change Order Adjustments
'.
".
sa.
STRAND
ASSOO'ATES, 'NO'
ENG'NEEOS
City of Oshkosh - Charles O. Green, Inc.
Contract 02-07, Change Order No.1
Page 2
July 17, 2003
Adjustment in Contract Price this Change Order
($1,832.79)
Current Contract Price including this Change Order
$108,412.21
Contract Completion Date Adjustment
Original Contract Completion Date
Contract Completion Date Adjustments due to previous Change
Orders
Contract Completion Date Adjustments due to this Change
Order
Current Contract Completion Dates including all Change
Orders
September 30, 2002
0 Days
365 Days
September 30, 2003
ent to the Contract and all provisions will apply
REC
Øþ~jL?
Date
ENG
APê~l~
CONTRACTOR - Charles O. Green, Inc.
~-3J-O3
Date
...J' ý -oy
Date
I certify that provision has been ade to pay the liability that will
accrue to the City of Oshkosh, Wisconsin, under the within Change Order.
~~r~
Comptroller
~, ~JJa~
, Cit ttorney
A^:-,g'1~'02 0'8:02a
Charles O. Green
920-734-6648
p.2
1701 S. Douglas Street
Appleton. Wisconsin 54914
GBo,§§N
920
Phone # (Rx1ð 734-66St!
Fax # (XX4<J~
920 734-6648
Public Utility Contractor
August 12, 2002
RyaN T. Amtmann
strand Associates
910 W. Wingra Drive
Madison, WI 53715
RE: waukau Ave. Pump Station
The following is what we received from Baenen Electric for
the additional work that you requested.
Labor Including Travel
Material
Miscellanous Expenses
$ 1,090.00
310.00
140.00
$ 1,540.00
Yours truly,
CHARLES O. GREEN, INC.
./'f 7 ~.:-:-/
.,,""--- .:..---.. - - -".. ..~----. . ./.~ /"
?~~-'/ .~~
,/ -Cftfi-l"Bs>D. Greerr
DC~ ' 1. 2°\32
2: 19PM
BAENEN ELECTRIC GREEN BAY OFFICE
NO. 55O
P.Ul
;' .
,~
BAENEN ELECTRIC SERVICE INC.
18/0 Cofrin Drive
Green Bay, WI 54302
(920) 468.8244
(920) 468-3430 Fax
September 23, 2002
Ðec;trical Contractor
Strand Associates
910 West Wingra Drive
Madison, WI 53715
Attn: Shane Zenz
Re: Waukau Lift Station
Electrical Quote for additional work at waukau pump station project - Oshkosh.
1,) Relocate 'j.," control conduits from existi.D.g control cabinet to new control cabinet
2.) Extend concrete pads and stainless steel mesh screen under new control cabinet
Material: ~ 800.00
. 4x8 88 Mesh
1-5/6" S8 strut channel
88 Anchors
. 88 Fastners
. W' PVC coated GRC HW conduit
. %" pva coated GRC rigid couplings
Concrete Pad Extension
Labor (with travel)
Equipment
Piau
$1320.00
$25.00
$175.00
Total: $2,320.00 - Two Thousand Three Hl.1ndred Twenty Dollars.
Sincerely,
Craig Johan6Bn
Craig Johansen
Baenen Electric Service, Inc.
. Industrial . Commercial . Residential
. Aerial Ladder . Trenching
1701 S. Douglas Street
Appleton. Wisconsin 54914
G~,§§N
920
Phone # ~X) 734-6688
Fax # P4.)),~mw;gaæ
920 734-6648
l .
STRAND ASSOÇíATF:-'::~C.'
August 12, 2002
. Ryan .T. Amtmann
Strand Associates
910 W. Wingra Drive
Madison, WI 53715
RE: WaukauAve. Pump Station Oshkosh
r
The following is the extra work due to the alignment of the
existing pumps in the wet well. The holes had to be made
larger in the wet well and extra bends (4 each) with Meg-a-
lugs had to be used to connect the pipes.
Labor:
Equipment:
Material:
$
660.20
322.73
724.28
Total Due:
$ 1707,21
Yours truly,
CHARLES"O,',. GREEN ",}r:5.
. ~~~?~ - ,./
<~~ ;;:;¿;. ~-¿----
Charles 0, Gréen