Loading...
HomeMy WebLinkAboutMain Street/Fox River Bridge STATR/MTTNTf'.TPAL AGRRRMRNT FORA HIGHWAY IMPROVEMENT PROJECT DATE: I.D.: HIGHWAY: LIMITS: COUNTY: February 18, 2004 4110-16-00 USH 45 LENGTH: 0.2 miles Main St. City of Oshkosh; Fox River Bridge-Algoma Blvd. Winnebago ~~ The signatory City of Oshosh hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): City of Oshkosh requested this project as part of downtown development plan with streetscaping. Proposed Improvement (nature of work): Reconstruct Main Street from Fox River to Algoma Blvd. as part of City's renewal project. Describe non-participating work included in the project contract: N/A Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Water Main and Sewer Work PHASE ESTIMATED COST Total Federal! State Municipal Estimated Cost Funds % Funds % Preliminary Engineering: Plan Development 50,000 37,000 75% 12,500 25% State Review and Proratable 5,000 3,750 75% 1,250 25% TOTAL COST DISTRIBUTION: $55,000 $40,750 75% $13,750 25% This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State, Signed for and in behalf of Sff abt: IA CrG br DS¡. ;::b';¡~ Municipality .5-1.1- ¡DO'-/- Date Name Title Signed for and in behalf of the City of Oshkosh ~;/~ RichardA~'Y~~langk, City Manager . >r, ( ~ ---c-20~ G ~~J Edward A. Nokes, City Comptroller I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. -. lA TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will.be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal/State financing commitments or are ineligible for Federal/State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and curb and gutter. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer main. c) Construction engineering incidental to inspection and supervisibn of actual construction work. d) Signing and pavement marking including detour routes. e) Othèr: Note: The following items may be included in paragraph 3 as eligible for Federal/State participation or included in paragraph 4 as entirely financed by the Municipality or other utility or facility owner. Preliminary engineering and State review services. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. b) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage. c) Conditioning, if required, and maintenance of detour routes. d) Repair damages to roads or streets cause by reason of their use in hauling materials incidental to the improvement. 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal! State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the State in behalf of the project. 7. The work will be administered by the State and may include items not eligible for Federal ! State participation. 2