CHANGE ORDER # 1
DATED: January 16, 2004
TO: MCC, Inc.
P.O.Box1137
Appleton, WI 54912-1137
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
01-16
, is hereby amended
NET DECREASE TO SECTION I - ASPHALT PAVING:
($37,923.85)
($37,923.85)
NET DECREASE TO CONTRACT:
Recommended:
~~f of;~beâ-s
~roved and acce.pted:
~(2~
Co tr cfor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
~ ")-cvJ) 0 þwfJ
Comptroller
..
"-'
CONTRACT: 01-16 CHANGE ORDER # 2
SECTION I-ASPHALT PAVING
ITEM
NUMBER
DESCRIPTION
Approx. 250 square feet of
1. sidewalk and driveway
removal, complete as
soecified, ner snuare foot 250.00 258.00 8.00 $1.90 $15.20
Approx. 15 lin. feet of 30"
2. curb & gutter removal and
replacement, complete as
soecified, oer Iin. ft. 15.00 26.70 11.70 $35.00 $409.50
Approx. 1,000 cubic yards
3. of excavation, compiete as
specified, per cubic yard
1000.00 480.00 -520.00 $4.95 ($2,574.00)
Approx. 10 square yards of
concrete pavement
4. removalfor11/2"butt
joint, complete as
soeclfled, oer so. yd. 10.00 10.00 $45.00
Approx. 7,500 square
yards of asphaltic
5. pavement milling,
complete as specified, per
so. vd. 7500.00 6,751.60 -748.40 $2.06 ($1,541.70)
Approx. 7,800 square
yards of asphaltic
6. pavement pulverizing,
complete as specified, per
so. vd. 7800.00 7,700.00 -100.00 $0.65 ($65.00)
Approx. 2,770 tons of
7. asphaltic concrete binder
material, complete as
soecified, oer ton 2770.00 2,316.00 -454.00 $26.23 ($11,908.42)
Approx. 1,950 tons of
8. asphaitlc concrete surface
material, complete as
soecified, oer ton 1950.00 1,685.80 -264.20 $29.48 ($7,788.62)
Approx. 230 square feet of
9. 4" concrete sidewalk,
complete as specified, per
so. ft. 230.00 258.00 28.00 $6.75 $189.00
10. No Bid Quantity - 0 square
feet 0.00 0.00 $0.00
Approx. 1,900 square
11. yards salvaged ashpaltic
pavement, completed as
soecified, oer so. yd. 1900.00 1,900.00 $2.51
Approx. 1,800 tons extra
12. crushed stone base,
complete as specified, per
ton 1800.00 762.80 -1,037.20 $9.38 ($9,728.94)
Page 1
i.
-
CONTRACT: 01-16 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
DESCRIPTION CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
Approx. 150 linear feet of
13. sawing, complete as
soecified, oer lin. foot 150.00 130.70 -19.30 $2.00 ($38.60)
Adjust approx. 12
14. manholes and inlets,
complete as specified,
each 12.00 16.00 4.00 $140.00 $560.00
15. No Bid Quantitv 0.00 0.00 $0.00
Preparation of foundation
for asphalt paving at Fire
16. Station #15 parking lot,
complete as specified,
lumD sum 1.00 1.00 $1,960.00
Preparation of foundation
17. for asphalt paving on
Mason Street, complete as
soeclfied, lumo sum 1.00 1.00 $1,960.00
Preparation of foundation
for asphalt paving on S.
18. Washburn Street,
complete as specified,
lumo sum 1.00 1.00 $4,200.00
Preparation of foundation
for asphalt paving on W.
Waukau Avenue (Wisc.
19. Central Ltd. RR to Fox
River Valley RR), complete
as specified, lump sum
1.00 1.00 $2,800.00
Preparation of foundation
for asphalt paving on W.
20. Waukau Avenue (Fox
River Valley RR to Fond
du Lac Road), complete as
snecified, lumn sum 1.00 1.00 $1,960.00
Preparation of foundation
for asphalt paving at
21. Wastewater Treatment
Plant parking lot, complete
as specified, lump sum
1.00 1.00 $2,100.00
SECTION I - (BID ITEMS 1 - 21) - SUB-TOTALS
$1,173.70
($33,645.28)
CONTRACT ADJUSTMENT: C.O. # 1 - SECTION I
DESCRIPTION
Page 2
"
"'.
CONTRACT: 01-16 CHANGE ORDER # 2
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
DESCRIPTION CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
2 Pavement Density
Deficiency Testing
Services ($3,200.00)
CONTRACT ADJUSTMENT: C.O. # 1 - (ITEMS 1 .2)
$0.00
($5,452.27)
($37,923.85)
NET DECREASE TO SECTION I -
($37,923.85)
NET DECREASE TO CONTRACT:
Page 3