Loading...
HomeMy WebLinkAboutPW CNT 01-16/Cng Ord #1 ':>- (~ eh-Jc- t CHANGE ORDER # 1 DATED: January 16, 2004 TO: MCC, Inc. P.O.Box1137 Appleton, WI 54912-1137 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 01-16 , is hereby amended NET DECREASE TO SECTION I - ASPHALT PAVING: ($37,923.85) ($37,923.85) NET DECREASE TO CONTRACT: Recommended: ~~f of;~beâ-s ~roved and acce.pted: ~(2~ Co tr cfor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~ ")-cvJ) 0 þwfJ Comptroller .. "-' CONTRACT: 01-16 CHANGE ORDER # 2 SECTION I-ASPHALT PAVING ITEM NUMBER DESCRIPTION Approx. 250 square feet of 1. sidewalk and driveway removal, complete as soecified, ner snuare foot 250.00 258.00 8.00 $1.90 $15.20 Approx. 15 lin. feet of 30" 2. curb & gutter removal and replacement, complete as soecified, oer Iin. ft. 15.00 26.70 11.70 $35.00 $409.50 Approx. 1,000 cubic yards 3. of excavation, compiete as specified, per cubic yard 1000.00 480.00 -520.00 $4.95 ($2,574.00) Approx. 10 square yards of concrete pavement 4. removalfor11/2"butt joint, complete as soeclfled, oer so. yd. 10.00 10.00 $45.00 Approx. 7,500 square yards of asphaltic 5. pavement milling, complete as specified, per so. vd. 7500.00 6,751.60 -748.40 $2.06 ($1,541.70) Approx. 7,800 square yards of asphaltic 6. pavement pulverizing, complete as specified, per so. vd. 7800.00 7,700.00 -100.00 $0.65 ($65.00) Approx. 2,770 tons of 7. asphaltic concrete binder material, complete as soecified, oer ton 2770.00 2,316.00 -454.00 $26.23 ($11,908.42) Approx. 1,950 tons of 8. asphaitlc concrete surface material, complete as soecified, oer ton 1950.00 1,685.80 -264.20 $29.48 ($7,788.62) Approx. 230 square feet of 9. 4" concrete sidewalk, complete as specified, per so. ft. 230.00 258.00 28.00 $6.75 $189.00 10. No Bid Quantity - 0 square feet 0.00 0.00 $0.00 Approx. 1,900 square 11. yards salvaged ashpaltic pavement, completed as soecified, oer so. yd. 1900.00 1,900.00 $2.51 Approx. 1,800 tons extra 12. crushed stone base, complete as specified, per ton 1800.00 762.80 -1,037.20 $9.38 ($9,728.94) Page 1 i. - CONTRACT: 01-16 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE Approx. 150 linear feet of 13. sawing, complete as soecified, oer lin. foot 150.00 130.70 -19.30 $2.00 ($38.60) Adjust approx. 12 14. manholes and inlets, complete as specified, each 12.00 16.00 4.00 $140.00 $560.00 15. No Bid Quantitv 0.00 0.00 $0.00 Preparation of foundation for asphalt paving at Fire 16. Station #15 parking lot, complete as specified, lumD sum 1.00 1.00 $1,960.00 Preparation of foundation 17. for asphalt paving on Mason Street, complete as soeclfied, lumo sum 1.00 1.00 $1,960.00 Preparation of foundation for asphalt paving on S. 18. Washburn Street, complete as specified, lumo sum 1.00 1.00 $4,200.00 Preparation of foundation for asphalt paving on W. Waukau Avenue (Wisc. 19. Central Ltd. RR to Fox River Valley RR), complete as specified, lump sum 1.00 1.00 $2,800.00 Preparation of foundation for asphalt paving on W. 20. Waukau Avenue (Fox River Valley RR to Fond du Lac Road), complete as snecified, lumn sum 1.00 1.00 $1,960.00 Preparation of foundation for asphalt paving at 21. Wastewater Treatment Plant parking lot, complete as specified, lump sum 1.00 1.00 $2,100.00 SECTION I - (BID ITEMS 1 - 21) - SUB-TOTALS $1,173.70 ($33,645.28) CONTRACT ADJUSTMENT: C.O. # 1 - SECTION I DESCRIPTION Page 2 " "'. CONTRACT: 01-16 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Pavement Density Deficiency Testing Services ($3,200.00) CONTRACT ADJUSTMENT: C.O. # 1 - (ITEMS 1 .2) $0.00 ($5,452.27) ($37,923.85) NET DECREASE TO SECTION I - ($37,923.85) NET DECREASE TO CONTRACT: Page 3