1. Bowen Street (between Otter and Parkway) Reconstruction Design Options presentation
and recommendation from the committee
The committee saw a preliminary presentation on this project at the January 9th meeting. AECOMM
is the engineering firm that is working with the city on this project. AECOMM will be presenting
information on the current facility usage, existing accommodations, and new bicycle facility
consideration. Attached is a memo that outlines the existing conditions, current standards and
recommendations for the Bowen Street typical section in Oshkosh, WI. We are looking for a
recommended alternative from the committee to forward to the City Council.
2. The City Attorney’s office has drafted a manual for Boards and Committees (will hand out
at the meeting) which may be helpful for current and/or new board members.
Additionally, they have recorded some training videos found here:
Ethics - https://youtu.be/_u4e7bGYtQ0
Public Records - https://youtu.be/bOwZz64AUAY
Open Meetings - https://youtu.be/8gW-fjqwR6Q
Please review these materials at your leisure, they may assist you in your role as a board member.
Staff Statements
❖ Ridership Update
❖ Transit Development Plan Implementation Update
❖ WisGO Electronic Card Reader System Update
❖ Sharrows are planned on Bay Shore Dr. (from Broad to Mill) which is being reconstructed in 2025
Transportation Committee
Staff Report
June 11, 2024