HomeMy WebLinkAbout0109290-Building (deck)ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: :.'.'.~'~ ~- ~
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: [] New Construction
Addition
ZONING:
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
[] Alteration
COMPLIANCE CHECKLIST
DEFICIENT
r-] use
Lot Width
r-I Lot Area
Lot Area Per Family
[] Flood Plain
[] Front Yard
[] Front Yard Side Street
DEFICIENT
[] Rear Yard
[] Side Yards
[] Building Area
[] Parking Standards
[] Off-Street Loading Standards
[] Vision Clearance
[] Transitional Yard Standards
DEFICIENT
[] Landscape Standards
[] Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
[] Mechanical Equip. Screening
[] Parking Lot Lighting
COMMENTS:
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve ali plans, except the fo/lowing: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed· (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
[ APPROVED
DENIED
Plan Commission Action Required
Variance(s) Required
2003
40
33. 1'
40.(
60.0,
40
60
40
DISCLAIMER
This map is neither a legally recorded map nor
a survey and it is not intended to be used as one.
This drawing is a compilation of records, data
and information located in various city, county
and state offices and other sources affecting
the area showq and it is to be used for reference
purposes only. The City of Oshkosh is not
sponsible for any inaccuracies herein contained.
If discrepencies are found, please contact the
City of Oshkosh.
532 Ceape Ave.
City of Oshkosh Wisconsin
Community Development
1" =30'
OJ"HKOJ"H
ON ~I~E WATER
Created by - djb
N
07/12/04
,~653 N WEST~ILL BL~/-~, GRAND CHUTE, WI 54914
(920) §93-1123
Wed Jul 0,7 20:19:14 2004
The materials for this project will cost $1895.40
ANNE VANG
TREATED PATIO DOOR
159977
3D View
· ~)/~993'1 '123
.,~ Jul 0~' 20:19:14 2004
,~h'e materials for this project will cost $1895.40
ANNE VANG
TREATED PATIO DOOR
159977
Post Layout for Deck 1
11' 1"
int
M VVb~ I HILL I¢LVL), (31'{ANI.) L;HU I ~-, VVl o4~14
~)'993-1123
¢~,ed Jul 07 20:19:14 2004
The. materi~ls for this project will cost $1895.40
ANNE VANG
TREATED PATIO DOOR
159977
Post Layout for Deck 2
~--10' 9"
int .................... v c