Loading...
HomeMy WebLinkAbout0109290-Building (deck)ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: :.'.'.~'~ ~- ~ PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: [] New Construction Addition ZONING: TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) [] Alteration COMPLIANCE CHECKLIST DEFICIENT r-] use Lot Width r-I Lot Area Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street DEFICIENT [] Rear Yard [] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting COMMENTS: REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve ali plans, except the fo/lowing: (1) Alterations or interior work when the use is conforming and when no change in use is proposed· (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. [ APPROVED DENIED Plan Commission Action Required Variance(s) Required 2003 40 33. 1' 40.( 60.0, 40 60 40 DISCLAIMER This map is neither a legally recorded map nor a survey and it is not intended to be used as one. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area showq and it is to be used for reference purposes only. The City of Oshkosh is not sponsible for any inaccuracies herein contained. If discrepencies are found, please contact the City of Oshkosh. 532 Ceape Ave. City of Oshkosh Wisconsin Community Development 1" =30' OJ"HKOJ"H ON ~I~E WATER Created by - djb N 07/12/04 ,~653 N WEST~ILL BL~/-~, GRAND CHUTE, WI 54914 (920) §93-1123 Wed Jul 0,7 20:19:14 2004 The materials for this project will cost $1895.40 ANNE VANG TREATED PATIO DOOR 159977 3D View · ~)/~993'1 '123 .,~ Jul 0~' 20:19:14 2004 ,~h'e materials for this project will cost $1895.40 ANNE VANG TREATED PATIO DOOR 159977 Post Layout for Deck 1 11' 1" int M VVb~ I HILL I¢LVL), (31'{ANI.) L;HU I ~-, VVl o4~14 ~)'993-1123 ¢~,ed Jul 07 20:19:14 2004 The. materi~ls for this project will cost $1895.40 ANNE VANG TREATED PATIO DOOR 159977 Post Layout for Deck 2 ~--10' 9" int .................... v c