HomeMy WebLinkAbout0109250-Building (upper bedroom)OSHKOSH
ON THE WATER
.lob Address 575 EVANS ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARY BETH COVILL
Contractor LM SMITH CO
Category 140 - Interior Remodeling
No 109250
Create Date 07/09/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Redrywalling an upper bedroom, gutting walls and ceiling on the lower level and redrywalling, siding and wrapping windows.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$14,500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$99.00 Park Dedication $0.00
Date 07/09/2004 Final/O.P. 00/00/0000
Parcel Id # 1102660000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address W 6527 LINCOLN RD VAN DYNE WI 54979 - 0000 Telephone Number 922-2700
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.