HomeMy WebLinkAbout0109491-Building (Raze/Remove Interior)OSHKOSH
ON THE WATER
.lob Address 631 HAZEL ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner GITCHI GUMEE LLC
Contractor GANTHER CONSTRUCTION
Category 285 - Wrecking (Industrial & Commercial
No 109491
Create Date 07/21/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Former Hospital / Raze and remove the interior 26,000 sf of the former hospital in preparation for continued redevelopment, install foundation
of Work ~valls where necessary and develop this area into a parking lot. *Landscape plans to be approved by August 31,
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$109,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$391.00 Park Dedication $0.00
Date 07/22/2004 Final/O.P. 00/00/0000
Parcel Id # 1103740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 4825 CTYTRKA OSHKOSH WI 54901 - 0000 Telephone Number
426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.