Loading...
HomeMy WebLinkAbout0109352-Plumbing (addn to #109223)OSHKOSH ON THE WATER .lob Address 655WEATHERSTONE DR Contractor P&S PLUMBING Bathtub 0 Whirlpool 0 Lavatory 1 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner DEWEY HOMES INC Category 410 - Residential-Interior No 109352 Create Date 07/16/2004 Plan Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work XTRA FIXTS TO PERMIT 109223 Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided Issued By Parcel Id # 1219750500 Date 07/16/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 2153 APPLETON WI 54912 - 2153 Telephone Number 920-722-5035, 920-7: To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.