Loading...
HomeMy WebLinkAbout04-225.doc JULY 13,2004 04-225 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN PURPOSE: GRANT PRIVILEGE IN STREET; GRANT EASEMENTS I HIGH AVENUE INITIATED BY: ALPHA TERRA SCIENCE & GUNDERSON CLEANERS, PETITIONERS PLAN COMMISSION RECOMMENDATION: Approved w/conditions WHEREAS, Alpha Terra Science and Gunderson Cleaners have requested the Common Council grant them the privilege of installing a groundwater monitoring well within the right-of-way of the alley north of and adjacent to 118 High Ave., per the attached, and WHEREAS, Section 66.0425, Wis. Stats., provides for the granting of a privilege in a right-of-way; and WHEREAS, the Plan Commission has approved of this request with conditions. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized and directed to grant Alpha Terra Science and Gunderson Cleaners the privilege of installing a groundwater monitoring well within the right-of-way of the alley north of and adjacent to 118 High Ave, per the attached, contingent upon the following: 1) The monitoring wells be installed in a manner that is approved by the Dept. of Public Works with no modifications or changes in construction procedure without prior approval by the Dept. of Public Works. 2) If no longer needed, the wells be properly abandoned and removed in accordance with City standards and under the direction of the Dept. of Public Works. 3) Any problem which may arise as a result of the placement of the wells be the responsibility of the petitioners to correct in coordination with the Dept. of Public Works. 4) All appropriate permits be obtained prior to the start of placement of the wells. 5) The wells be modified or removed immediately upon the request of the City. 6) The petitioners secure and submit to the City Clerk a separate insurance policy which names the City as an additional insured with a minimum coverage of $200,000 per person and $500,000 in general aggregate. JULY 13,2004 04-225 RESOLUTION CONT'D 7) It is the responsibility of the petitioners to file in a timely manner a new insurance certificate with the City Clerk upon expiration of an existing certificate. Failure to do so will result in the revocation of the privilege in street upon 10 days notice. 8) The petitioners execute a hold harmless agreement with the City. BE IT FURTHER RESOLVED that the proper City officials are hereby authorized and directed to grant easements to Alpha Terra Science and/or Gunderson Cleaners for installation of monitoring wells within the parking lot of the Grand Opera House, and within the grass strip area of the High Ave. parking lot on the south side of High Ave. across from 118 High Ave., per the attached, and that any such placements shall be coordinated with and approved by the Department of Public Works. Conditions of approval are as noted above. BE IT FURTHER RESOLVED that the proper City officials are hereby authorized and directed to execute appropriate documents for purposes of same. LEGEND . """""""""" ap" PROf'OSB)NR141 ill MONrroRING\\aU l}JMW-101 PlEZOfÆIER -$-, PROPOSEOGEOPROÐE 19!PœARY1lE1l. 1W-11 0 PROPOSEOGEOPROBE GP-10 ~~.. i i ¡ 1 i",i Q: : \1 i ~ i ¡~ i iA ¡ ¡ i 1 ~ ! ~ i i ¡ i : : :~ I :w !w i i~ - ¡eI) ; i~ :0 iœ: ¡m ! : t - ~ ~ l cJ!\..t-,? ... ¡ ,'I i : ¡ i --rr- 6-1- . "'¡ 6"'.00_">"._-...-- ...,. \/ /~~ 0 -$MW-1D8 .. GP.12 ..n..__._-_u~"".__"n_on_::u_._u- <J n.mm--u.u_-..~;;,;;;-~ .... . -- ->.-. - .. --- e¡,¡,-..-.. -.- ._'-";"-;';-- - 8 Parl<lng Lot (asph.R) aM 8.. ~ I i !~ ., GUNDERSON CLEANERS 118 High St I :1 I r n---__m.._m_.n--.n, ......., ...... .- , , """'NT "'-. -- _u...."",,' -'. - ....7 '*""" -, ..'.. MH '. ...... --O.. .->-p- ---. -- -- .-.>e-- -_P..._--- < ~ ~ ; N -$. MW-102 Par1<ing Loll Driveway former City Oshkosh Building (asphalt) ........". -- -- -.- unonu HIGflSTREEL__..ou_...--..__._.._mm>____..-.-._...._..m. i ./ ./ ...........~_.~ -$ MW-105 -$Mw-104 Attachment to Privilege In Street Application, Gunderson Cleaners, 118 High Avenue, Oshkosh, WI The proposed scope of work includes the installation of five monitoring wells and one boring within the right-of-way of the City of Oshkosh. The work is being completed for an enviromnental investigation of the Gunderson Cleaners facility on High Avenue (Figure 1). All six planned well and boring locations are shown on Figure 3, and details regarding the wells on the City of Oshkosh Right of Way are shown on maps provided by the City of Oshkosh (Figures 2 and 4). Each monitoring well (MW-I02 through MW-1O5, TW-12) will be installed using a truck-mounted drill rig with hollow stem augers. An 8-inch diameter borehole will be advanced to approximately 15 to 35 feet below grade, and a 2-inch diameter Schedule 40 PVC monitoring well will be installed at the borehole base. Filter pack sand and a bentonite clay seal will be used to isolate the screened interval of the well, per WAC NRl41 well construction code. The surface will be completed using a 10-inch diameter flush mounted traffic-weight protective well cover, which will be cemented in place. The well cover will be bolted shut, and a locked, watertight well cap will cover the 2-inch PVC inside the steel covet. The borehole (GP-13) will be installed using a continuous flight auger and split spoon sampling techniques, or smaller diameter hollow stem augers, to a depth of approximately 20 feet. This boring will be backfilled upon completion using bentonite clay. The surface will be restored with asphalt patch to grade. Two of the monitoring wells (MW -102 and MW -103) will be located in the asphalt parking lot just east of the Thompson Studio building located at 114 High Street (Figure 2, Figure 3). Well MW- 103 will not be completed in the concrete of the sidewalk; it will be immediately north of the sidewalk in the asphalt (Figure 2). Two other monitoring wells (MW-I04 and MW-1O5) will be located in the lO-foot wide grass vegetation strip immediately south ofthe concrete sidewalk south of High Street, just north of the 115 High Avenue property (Figure 2). Monitoring well TW-12 and GP-13 will be installed in the alley north of the Gunderson Cleaners building, approximately 10 feet north of the sanitary and storm sewer lines and even with the Gunderson Cleaners dock door and eastern edge of the building, respectively (Figure 4). Precise final locations will be dependent on utility locations, which will be marked by Diggers Homne prior to completion of the work. Groundwater samples will be collected from the wells until closure of the site is obtained from the Wisconsin Department of Natural Resources. The duration of the sampling will depend on the results of the testing, but will likely be necessary for a period oftwo years or longer. The WDNR contact for this project is Ms Kathy Sylvester at the WDNR Oshkosh office. She can be reached at 424-0399. Upon completion of the groundwater sampling, the wells will be abandoned per NR 141 code by filling thePVC with bentonite clay and restoration of the ground surface with topsoil or asphalt, depending upon the location of the well. f:'.J'oo\gw>_.,.m="""2004-01\repo""p"""',,tdoo