HomeMy WebLinkAbout0109190 BOSHKOSH
ON THE WATER
.lob Address 1740 MICHIGAN ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANDREW R GEURTS
Contractor OWNER
Category 251 - Fences
No 109190
Create Date 07/08/2004
Plan
Type
Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Poured Concrete
Concrete Block
Not Required
Not Required
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain No Height Permit
# Dwelling Units 0 # Structures
Size
~J Projection
Canopies
Signs
Not Required
Use/Nature SFR/Construct 72 If of 6 ft high solid wood fence along rear lot line, and 460 If of 4 ft high soild wood fence along side lot lines in rear yard, and
of Work 140 If of split rail fence along side yard as per site plan.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,400.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$32.00 Park Dedication $0.00
Date 07/08/2004 Final/O.P. 00/00/0000
Parcel Id # 1404570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1740 MICHIGAN ST
Agent/Owner
OSHKOSH
WI 54902 - 6833 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.