Loading...
HomeMy WebLinkAbout0109097-Building (foundation) � CITY OF OSHKOSH No 109097 ; OSHKOSH BUILDING PERMIT -APPLICATION AND RECOl3p—� ON THE WATER �V � �y>, Job Address 55 CRIMSON LN Owner GRANT SCHULTZ Z ` _ z �eat�Date 06/30/2004 Designer Contractor OWNER ��� Category 112-Foundation Permit Single Family Plan Type � Building � Sign � Canopy � Fence � Raze Zoning R-1 Class of Const: Size Unfinished/Basement 1801 Sq.Ft. Rooms 0 Height 0 Ft. � Projection � Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature �NSFR/EARLY START/Footings and Foundation for a new home. Work shall not procede above the foundation. of Work ' � � i ,' HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,000.00 Plan Approval $0.00 Permit Fee Paid $149.00 Park Dedication $0.00 Issued By: Date 07/01/2004 Finai/O.P. 00/00/0000 � Permit Voided I Parcel Id# 1415550000 In the perFormance of this work I agree to perForm all work pursuant to rules governing the described construction. While the City of Oshkpsh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this perm' applicatio withi n e semen the City strongly urges the permit applicant to contact the easement holder(s)and to se ur �any ne sary I ef mg such activity. M� /O� Signature Date ����� ent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.