Loading...
HomeMy WebLinkAbout0109061-BuildingOSHKOSH ON THE WATER .lob .Address 40 W 11TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID L/GINA MUEGGE Contractor OWNER Category 140 - Interior Remodeling No 109061 Create Date 07/01/2004 Plan Type 10 Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling an exisitng room on the first floor to be used as a den/office. Owner will be removing and replacing drywall, adding headers, of Work rirestops and insulating the walls. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $3,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 07/01/2004 Final/O.P. 00/00/0000 Parcel Id # 0302510000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 40W11THAVE Agent/Owner OSHKOSH WI 54902 - 6010 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.