Loading...
HomeMy WebLinkAbout0109178-Building (water damage)OSHKOSH ON THE WATER .lob Address 3370 LOUISE CT Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JODILBURNS Contractor OWNER Category 140 - Interior Remodeling No 109178 Create Date 07/08/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/WATER DAMAGE/Remodeling the basement to create a play room, rec room, bath room, storage area, and laundry area. A minimum of of Work 7' ceiling height is required for 50% of the floor area. A minimum of 6'4" is required under any beams or ductwork. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $4,800.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $44.00 Park Dedication $0.00 Date 07/08/2004 Final/O.P. 00/00/0000 Parcel Id # 1550170000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3370 LOUISE CT OSHKOSH WI 54901 - 0000 Telephone Number 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.