HomeMy WebLinkAbout0109178-Building (water damage)OSHKOSH
ON THE WATER
.lob Address 3370 LOUISE CT
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JODILBURNS
Contractor OWNER
Category 140 - Interior Remodeling
No 109178
Create Date 07/08/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/WATER DAMAGE/Remodeling the basement to create a play room, rec room, bath room, storage area, and laundry area. A minimum of
of Work 7' ceiling height is required for 50% of the floor area. A minimum of 6'4" is required under any beams or ductwork.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$4,800.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$44.00 Park Dedication $0.00
Date 07/08/2004 Final/O.P. 00/00/0000
Parcel Id # 1550170000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 3370 LOUISE CT OSHKOSH WI 54901 - 0000 Telephone Number
231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.