HomeMy WebLinkAbout23-10 CO #1 (Final)_3-21-24TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #1 (FINAL) P.O. BOX 137 TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 23-10, awarded May 9, 2023, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($41,201.72) NET INCREASE TO ADDITIONAL WORK:$17,393.25 NET DECREASE TO CONTRACT ($23,808.47) SECTION I TOTALS BID TOTAL $893,580.84 $893,580.84 CO #1 ($23,808.47)($23,808.47) CONTRACT TOTAL $869,772.37 $869,772.37 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: MARCH 21, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63 CONTRACT 23-10 CHANGE ORDER #1 (FINAL) 23-10 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $98,000.00 1103 Removing building foundations; complete as specified Linear Feet 100.00 0.00 -100.00 $0.01 ($1.00) 1110 Removing curb and gutter; complete as specified Linear Feet 520.00 509.87 -10.13 $6.50 ($65.85) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 2,900.00 3,059.44 159.44 $1.00 $159.44 1200 Unclassified excavation; complete as specified Cubic Yards 660.00 769.89 109.89 $59.49 $6,537.36 1220 Excavation special (paving); complete as specified Tons 94.00 0.00 -94.00 $0.01 ($0.94) 1250 Furnish and install dumpster enclosure (includes foundation; concrete slab; walls; gates; and all associated materials and labor); complete as specified Lump Sum 1.00 1.00 $165,000.00 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 1,010.00 987.67 -22.33 $66.95 ($1,494.99) 1350 Pavement ties; complete as specified Each 16.00 83.00 67.00 $10.00 $670.00 1352 Drilled dowel bars; 1"; complete as specified Each 26.00 18.00 -8.00 $17.50 ($140.00) 1360 Adjust manholes and inlets; complete as specified Each 12.00 2.00 -10.00 $450.00 ($4,500.00) 1370 Turf restoration; complete as specified Square Yards 2,100.00 600.77 -1,499.23 $13.75 ($20,614.41) 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 300.00 0.00 -300.00 $0.01 ($3.00) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 300.00 0.00 -300.00 $0.01 ($3.00) 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 300.00 0.00 -300.00 $0.01 ($3.00) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 58.00 0.00 -58.00 $0.01 ($0.58) Page 2 of 6 DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63 CONTRACT 23-10 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 310.00 302.07 -7.93 $15.00 ($118.95) 1428 18" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 94.00 109.94 15.94 $88.00 $1,402.72 1440 30" curb and gutter; 7": with 5" CABC and grading; complete as specified Linear Feet 414.00 403.53 -10.47 $59.30 ($620.87) 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 63.00 108.50 45.50 $88.00 $4,004.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 1,240.00 1,273.30 33.30 $11.25 $374.63 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 82.00 145.46 63.46 $12.25 $777.39 1516 6" concrete sidewalk/ driveway/ramp with false curb; 3" CABC; and grading; complete as specified Square Feet 224.00 0.00 -224.00 $12.25 ($2,744.00) 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 2,180.00 2,396.70 216.70 $10.25 $2,221.18 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 40.00 30.00 -10.00 $45.00 ($450.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 21.00 24.00 3.00 $8.00 $24.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00) 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00) Page 3 of 6 DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63 CONTRACT 23-10 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1590 Up-charge for late cold weather concrete sidewalk; complete as specified Cubic Yards 22.00 0.00 -22.00 $0.01 ($0.22) 1650 Locate existing property monuments; complete as specified Each 1.00 2.00 1.00 $500.00 $500.00 1652 Replace existing property monuments; complete as specified Each 1.00 1.00 $100.00 1700 Sawing existing pavement; complete as specified Linear Feet 2,950.00 2,651.94 -298.06 $3.00 ($894.18) 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 35.00 226.35 191.35 $3.00 $574.05 1800 Base aggregate dense; 3/4"; complete as specified Tons 11.00 11.00 $111.00 1801 Base aggregate dense; 1- 1/4"; complete as specified Tons 550.00 567.00 17.00 $29.14 $495.38 1900 Tack coat; complete as specified Gallons 880.00 531.43 -348.57 $3.44 ($1,199.08) 1901 HMA Pavement LT; complete as specified Tons 1,450.00 1,586.93 136.93 $90.60 $12,405.86 1903 HMA cold weather paving; complete as specified Tons 390.00 22.52 -367.48 $11.00 ($4,042.28) 1950 Asphaltic pavement milling; complete as specified Square Yards 12,000.00 11,455.92 -544.08 $3.89 ($2,116.47) 1960A Prepare foundation for asphaltic paving (South Park tennis courts lot); complete as specified Lump Sum 1.00 1.00 $101.00 1960B Prepare foundation for asphaltic paving (24th Avenue boat launch lot); complete as specified Lump Sum 1.00 1.00 $8,434.00 1960C Prepare foundation for asphaltic paving (400 West Parking Lot); complete as specified Lump Sum 1.00 1.00 $9,646.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 30,500.00 22,280.85 -8,219.15 $0.74 ($6,082.17) 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 24,000.00 24,433.70 433.70 $0.78 $338.29 1976 Pavement markings; epoxy; 8" (white); complete as specified Linear Feet 590.00 539.00 -51.00 $4.40 ($224.40) 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 260.00 249.13 -10.87 $16.50 ($179.36) Page 4 of 6 DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63 CONTRACT 23-10 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1978 Pavement markings; stop- line epoxy; 18" (white); complete as specified Linear Feet 94.00 87.77 -6.23 $27.50 ($171.33) 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 50.00 50.00 $250.00 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 74.00 74.00 $265.00 1982 Pavement markings; epoxy; 12" diagonal (yellow); complete as specified Linear Feet 350.00 353.14 3.14 $15.40 $48.36 1983 Pavement markings; word; epoxy (white); complete as specified Each 3.00 3.00 $440.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 56.00 56.00 $242.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 4,500.00 0.00 -4,500.00 $0.66 ($2,970.00) 1986A Remove pavement markings (Fond du Lac Road/South Main Street); complete as specified Lump Sum 1.00 1.00 $20,000.00 1986B Remove pavement markings (various locations); complete as specified Lump Sum 1.00 1.00 $6,000.00 1988 Pavement markings; railroad crossing; epoxy (white); complete as specified Lump Sum 1.00 1.00 $3,000.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 130.00 8.00 -122.00 $180.00 ($21,960.00) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 130.00 0.00 -130.00 $0.01 ($1.30) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 10.00 0.00 -10.00 $50.00 ($500.00) Page 5 of 6 DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63 CONTRACT 23-10 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2520 Furnish; install; maintain; and remove 20" diameter sediment logs; complete as specified Linear Feet 540.00 500.00 -40.00 $15.00 ($600.00) SECTION I (BID ITEMS 1050 - 2520) - SUBTOTAL: $30,532.66 ($71,734.38) NET DECREASE TO SECTION I: ($41,201.72) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10000 Purchase and install new trees along Division St; additional mobilization costs for Phase 2 (Vinton and NEA); complete as specified Lump Sum 0.00 1.00 1.00 $17,393.25 $17,393.25 $17,393.25 $0.00 $17,393.25 NET DECREASE TO SECTION I:($41,201.72) $17,393.25 NET DECREASE TO CONTRACT:($23,808.47) ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ADDITIONAL WORK: NET INCREASE: ADDITIONAL WORK REQUIRED: CO #1 SUBTOTAL: Page 6 of 6 DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63