HomeMy WebLinkAbout23-10 CO #1 (Final)_3-21-24TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #1 (FINAL)
P.O. BOX 137
TWO RIVERS, WI 54241
Your present contract with the City of Oshkosh, Contract No. 23-10, awarded May 9, 2023, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($41,201.72)
NET INCREASE TO ADDITIONAL WORK:$17,393.25
NET DECREASE TO CONTRACT ($23,808.47)
SECTION I TOTALS
BID TOTAL $893,580.84 $893,580.84
CO #1 ($23,808.47)($23,808.47)
CONTRACT TOTAL $869,772.37 $869,772.37
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: MARCH 21, 2024
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63
CONTRACT 23-10 CHANGE ORDER #1 (FINAL)
23-10
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $98,000.00
1103
Removing building
foundations; complete as
specified
Linear
Feet 100.00 0.00 -100.00 $0.01 ($1.00)
1110
Removing curb and gutter;
complete as specified
Linear
Feet 520.00 509.87 -10.13 $6.50 ($65.85)
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 2,900.00 3,059.44 159.44 $1.00 $159.44
1200
Unclassified excavation;
complete as specified
Cubic
Yards 660.00 769.89 109.89 $59.49 $6,537.36
1220
Excavation special (paving);
complete as specified Tons 94.00 0.00 -94.00 $0.01 ($0.94)
1250
Furnish and install dumpster
enclosure (includes
foundation; concrete slab;
walls; gates; and all
associated materials and
labor); complete as specified
Lump
Sum 1.00 1.00 $165,000.00
1303
7" concrete pavement HES;
with 5" CABC and grading;
complete as specified
Square
Yards 1,010.00 987.67 -22.33 $66.95 ($1,494.99)
1350
Pavement ties; complete as
specified Each 16.00 83.00 67.00 $10.00 $670.00
1352
Drilled dowel bars; 1";
complete as specified Each 26.00 18.00 -8.00 $17.50 ($140.00)
1360
Adjust manholes and inlets;
complete as specified Each 12.00 2.00 -10.00 $450.00 ($4,500.00)
1370
Turf restoration; complete as
specified
Square
Yards 2,100.00 600.77 -1,499.23 $13.75 ($20,614.41)
1380
Cold weather covering
(concrete pavement) - single
visquine; complete as
specified
Square
Yards 300.00 0.00 -300.00 $0.01 ($3.00)
1382
Cold weather covering
(concrete pavement) -
double visquine; complete
as specified
Square
Yards 300.00 0.00 -300.00 $0.01 ($3.00)
1384
Cold weather covering
(concrete pavement) -
double visquine with 6" hay;
complete as specified
Square
Yards 300.00 0.00 -300.00 $0.01 ($3.00)
1390
Up-charge for late season
cold weather concrete
pavement; complete as
specified
Cubic
Yards 58.00 0.00 -58.00 $0.01 ($0.58)
Page 2 of 6
DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63
CONTRACT 23-10 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1410
12" radius curb with 6"
CABC and grading;
complete as specified
Linear
Feet 310.00 302.07 -7.93 $15.00 ($118.95)
1428
18" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
as specified
Linear
Feet 94.00 109.94 15.94 $88.00 $1,402.72
1440
30" curb and gutter; 7": with
5" CABC and grading;
complete as specified
Linear
Feet 414.00 403.53 -10.47 $59.30 ($620.87)
1448
30" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
as specified
Linear
Feet 63.00 108.50 45.50 $88.00 $4,004.00
1500
4" concrete sidewalk with 3"
CABC and grading;
complete as specified
Square
Feet 1,240.00 1,273.30 33.30 $11.25 $374.63
1510
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
specified
Square
Feet 82.00 145.46 63.46 $12.25 $777.39
1516
6" concrete sidewalk/
driveway/ramp with false
curb; 3" CABC; and grading;
complete as specified
Square
Feet 224.00 0.00 -224.00 $12.25 ($2,744.00)
1524
8" concrete sidewalk/
driveway/ramp (HES) with 3"
CABC and grading;
complete as specified
Square
Feet 2,180.00 2,396.70 216.70 $10.25 $2,221.18
1540
Curb ramp detectable
warning field (natural/
non-painted); complete as
specified
Square
Feet 40.00 30.00 -10.00 $45.00 ($450.00)
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 21.00 24.00 3.00 $8.00 $24.00
1580
Cold weather covering
(sidewalk) - single visquine;
complete as specified
Square
Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00)
1582
Cold weather covering
(sidewalk) - double visquine;
complete as specified
Square
Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00)
1584
Cold weather covering
(sidewalk) - double visquine
with 6" hay; complete as
specified
Square
Feet 1,100.00 0.00 -1,100.00 $0.01 ($11.00)
Page 3 of 6
DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63
CONTRACT 23-10 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1590
Up-charge for late cold
weather concrete sidewalk;
complete as specified
Cubic
Yards 22.00 0.00 -22.00 $0.01 ($0.22)
1650
Locate existing property
monuments; complete as
specified Each 1.00 2.00 1.00 $500.00 $500.00
1652
Replace existing property
monuments; complete as
specified Each 1.00 1.00 $100.00
1700
Sawing existing pavement;
complete as specified
Linear
Feet 2,950.00 2,651.94 -298.06 $3.00 ($894.18)
1710
Sawing concrete pavement
full depth; complete as
specified
Linear
Feet 35.00 226.35 191.35 $3.00 $574.05
1800
Base aggregate dense; 3/4";
complete as specified Tons 11.00 11.00 $111.00
1801
Base aggregate dense; 1-
1/4"; complete as specified Tons 550.00 567.00 17.00 $29.14 $495.38
1900
Tack coat; complete as
specified Gallons 880.00 531.43 -348.57 $3.44 ($1,199.08)
1901
HMA Pavement LT;
complete as specified Tons 1,450.00 1,586.93 136.93 $90.60 $12,405.86
1903
HMA cold weather paving;
complete as specified Tons 390.00 22.52 -367.48 $11.00 ($4,042.28)
1950
Asphaltic pavement milling;
complete as specified
Square
Yards 12,000.00 11,455.92 -544.08 $3.89 ($2,116.47)
1960A
Prepare foundation for
asphaltic paving (South Park
tennis courts lot); complete
as specified
Lump
Sum 1.00 1.00 $101.00
1960B
Prepare foundation for
asphaltic paving (24th
Avenue boat launch lot);
complete as specified
Lump
Sum 1.00 1.00 $8,434.00
1960C
Prepare foundation for
asphaltic paving (400 West
Parking Lot); complete as
specified
Lump
Sum 1.00 1.00 $9,646.00
1974
Pavement markings; epoxy;
4" (white); complete as
specified
Linear
Feet 30,500.00 22,280.85 -8,219.15 $0.74 ($6,082.17)
1975
Pavement markings; epoxy;
4" (yellow); complete as
specified
Linear
Feet 24,000.00 24,433.70 433.70 $0.78 $338.29
1976
Pavement markings; epoxy;
8" (white); complete as
specified
Linear
Feet 590.00 539.00 -51.00 $4.40 ($224.40)
1977
Pavement markings; cross-
walk epoxy; 6" (white);
complete as specified
Linear
Feet 260.00 249.13 -10.87 $16.50 ($179.36)
Page 4 of 6
DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63
CONTRACT 23-10 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1978
Pavement markings; stop-
line epoxy; 18" (white);
complete as specified
Linear
Feet 94.00 87.77 -6.23 $27.50 ($171.33)
1979
Pavement markings; arrow
epoxy; Type 1 (white);
complete as specified Each 50.00 50.00 $250.00
1980
Pavement markings; arrow
epoxy; Type 2 (white);
complete as specified Each 74.00 74.00 $265.00
1982
Pavement markings; epoxy;
12" diagonal (yellow);
complete as specified
Linear
Feet 350.00 353.14 3.14 $15.40 $48.36
1983
Pavement markings; word;
epoxy (white); complete as
specified Each 3.00 3.00 $440.00
1984
Pavement markings; symbol;
epoxy (white); complete as
specified Each 56.00 56.00 $242.00
1985
Temporary pavement
markings; paint; 4" (white);
complete as specified
Linear
Feet 4,500.00 0.00 -4,500.00 $0.66 ($2,970.00)
1986A
Remove pavement markings
(Fond du Lac Road/South
Main Street); complete as
specified
Lump
Sum 1.00 1.00 $20,000.00
1986B
Remove pavement markings
(various locations); complete
as specified
Lump
Sum 1.00 1.00 $6,000.00
1988
Pavement markings; railroad
crossing; epoxy (white);
complete as specified
Lump
Sum 1.00 1.00 $3,000.00
2508
Furnish; install; maintain;
and remove Type D modified
inlet protection; complete as
specified Each 130.00 8.00 -122.00 $180.00 ($21,960.00)
2510
Sediment removal - Type D
modified inlet protection;
complete as specified Each 130.00 0.00 -130.00 $0.01 ($1.30)
2516
Furnish; install; maintain;
and remove stone bag;
complete as specified Each 10.00 0.00 -10.00 $50.00 ($500.00)
Page 5 of 6
DocuSign Envelope ID: FBD9A2F7-59E4-404F-B000-8083E6462A63
CONTRACT 23-10 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2520
Furnish; install; maintain;
and remove 20" diameter
sediment logs; complete as
specified
Linear
Feet 540.00 500.00 -40.00 $15.00 ($600.00)
SECTION I (BID ITEMS 1050 - 2520) - SUBTOTAL: $30,532.66 ($71,734.38)
NET DECREASE TO SECTION I: ($41,201.72)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-10000
Purchase and install new
trees along Division St;
additional mobilization costs
for Phase 2 (Vinton and
NEA); complete as specified
Lump
Sum 0.00 1.00 1.00 $17,393.25 $17,393.25
$17,393.25 $0.00
$17,393.25
NET DECREASE TO SECTION I:($41,201.72)
$17,393.25
NET DECREASE TO CONTRACT:($23,808.47)