Loading...
HomeMy WebLinkAbout0108992-BuildingOSHKOSH ON THE WATER .lob ,Address 2125 W 20TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES A/MARY L MORGAN Contractor FLUOR BROS CONSTRUCTION CO Category 210 - Addition Industrial No 108992 Create Date 06/25/2004 Plan J8-122-1103 Type [(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: 2B Size 28x50 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 1260 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature Contractor Shop/Office. 28x50 warehouse addition to warehouse. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $28,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $148.00 Park Dedication $0.00 Date 06/29/2004 Final/O.P. 00/00/0000 Parcel Id # 1326560000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 203 OTTER AVE OSHKOSH WI 54901 - 0000 Telephone Number 231-6260 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: [] New Construction -.~-~Addition [] Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT, [] Use [] Lot Width [] Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street [] Rear Yard r~ Side Yards r-I Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED Plan Commission Action Required DENIED Variance(s) Required REVIEWED BY: ./x~ ~ //~., DATE: 2003